RABAR CONST is listed as a company organization in Philippine public procurement records on this site, with 5 linked DPWH project(s) totaling about ₱13,506,254.11. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
RABAR CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 5
- Total value
- ₱13,506,254.11
- Published flags
- 0
- Region
- Zamboanga City 2nd DEO · Region IX
Online presence
Google Maps: Rabar Construction and TradingGoogle Maps, 2026-10-22
17-24, BCC Complex, Labuan-Limpapa National Road, Baliwasan Grande, Zamboanga City, 7000 Zamboanga del Sur
Public Record Grade
A transparent, data-derived summary of reported public records for RABAR CONST — not an accusation or finding of wrongdoing.
Score: 80.00 / 100 · Projects in sample: 5 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 100/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 100
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 5
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 5
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 5
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 5
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 5
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 5
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
1 geotagged project — Open full map
- CONSTRUCTION OF DRAINAGE SYSTEM AT GOV. CAMINS AVE., STA. MARIA, BARANGAY STA. MARIA, ZAMBOANGA CITY16JA0024 · ₱3,081,126.14
- CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING WITH ATTACHED TOILET AT SIBULAO NATIONAL HIGH SCHOOL, ZAMBOANGA CITY17JA0122 · ₱2,980,225.13
- CONCRETING OF TALISAYAN FMR, BARANGAY TALISAYAN, ZAMBOANGA CITY17JA0108 · ₱2,890,752.84 · mapped
- ROAD UPGRADING GRAVEL TO PAVED AT BARANGAY SIBULAO, ZAMBOANGA CITY 2ND LD17JA0081 · ₱2,808,150.00
- CONSTRUCTION OF DRAINAGE SYSTEM AT BRGY. CANELAR (INCLUDING RIGHT OF WAY ACQUISITION), ZAMBOANGA CITY 1ST LD17JA0042 · ₱1,746,000.00
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
