ADDED CONST SERVICES is listed as a company organization in Philippine public procurement records on this site, with 5 linked DPWH project(s) totaling about ₱89,433,132.38. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
ADDED CONST SERVICES
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 5
- Total value
- ₱89,433,132.38
- Published flags
- 0
- Region
- Sultan Kudarat 2nd DEO · Region XII
Licensed officers (PCAB)
- KIM RODOLPH PEÑALOSA BIÑAS · Authorized Managing Officer (PCAB license 56115) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ADDED CONST SERVICES — not an accusation or finding of wrongdoing.
Score: 74.10 / 100 · Projects in sample: 5 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 66.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 66.7
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 4
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 5
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 5
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 5
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 5
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 5
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
5 geotagged projects — Open full map
- Construction of Lambayong RIS Protection Dike, Upstream of Dam, Isulan, Sultan Kudarat24MF0014 · ₱29,050,363.85 · mapped
- REHABILITATION/MAJOR REPAIR OF BRIDGE - BAGUMBAYAN BR. (B00608MN) ALONG ISULAN JCT. - NINOY AQUINO RD (PHASE II)25MH0016 · ₱23,610,178.29 · mapped
- REHABILITATION/MAJOR REPAIR OF BRDGE - SEBAYOR BR. 4 (B01872MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD25MH0017 · ₱17,453,010.51 · mapped
- CONSTRUCTION OF ROAD, BARANGAY MAPANTIG, MUNICIPALITY OF ISULAN, PROVINCE OF SULTAN KUDARAT24MF0031 · ₱9,814,553.08 · mapped
- CONSTRUCTION OF CONCRETE ROAD - NRJ TO SITIO SEWAL LEADING TO LAGBASAN CAVE PASSING THRU BURIAL CAVE, BRGY. KUDEN, SEN. NINOY AQUINO, SULTAN KUDARAT25MH0032 · ₱9,505,026.65 · mapped
Across government
- DPWH Infrastructure: 6 awards · ₱123,727,544.78
- 25MH0032₱9,505,026.65· 2025-03-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SULTAN KUDARAT 2ND
- 25MH0016₱23,610,178.29· 2025-03-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SULTAN KUDARAT 2ND
- 25MH0017₱17,453,010.51· 2025-03-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SULTAN KUDARAT 2ND
- 25MH0012₱34,294,412.40· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SULTAN KUDARAT 2ND
- 24MF0031₱9,814,553.08· 2024-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SULTAN KUDARAT 1ST
- 24MF0014₱29,050,363.85· 2024-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SULTAN KUDARAT 1ST
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
