CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL
CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL is a DPWH-tracked public work in Misamis Oriental 1st DEO, Region X. Reported contract value: ₱95,535,334.31. Status: Past target date (DPWH On-Going). Contractor on record: ROAD EDGE TRADING. Figures trace to dpwh.