DPWH projects in Misamis Oriental
2,472 DPWH public works projects are recorded in Misamis Oriental (Region X), with start dates from 2016 to 2025. Recorded contract values total about ₱50,656,009,610.08. 2,283 are recorded at 100% progress and 283 are flood control works. Figures are as recorded by DPWH; they are not findings.
Largest recorded projects
- Construction of Flood Control Structure at Tagoloan River, Package 6, Misamis Oriental₱282,250,640.70
- Construction of Flood Control Structure at Tagoloan River, Package 8, Misamis Oriental₱280,801,925.40
- Construction of Flood Control Structure at Tagoloan River, Package 7, Misamis Oriental₱279,359,677.50
- Construction of Flood Control Structure at Tagoloan River, Package 10, Misamis Oriental₱266,231,274.70
- Construction of Bypass and Diversion Roads, Gingoog Bypass Road, Misamis Oriental (Phase Iii), Gingoog City, Misamis Oriental₱264,595,534.40
- Northeastern Misamis General Hospital Villanueva, Misamis Oriental₱148,500,000.00
- Construction of Flood Control Structure Along Iponan River, Package 9, Cagayan de Oro City₱146,125,204.50
- Construction of Flood Mitigation Structure, Tagoloan River, Maribojoc Section, Package 1, Tagoloan, Misamis Oriental₱144,449,572.81
- Construction of Flood Mitigation Structure, Tagoloan River, Maribojoc Section, Package 2, Tagoloan, Misamis Oriental₱144,049,398.69
- Construction of Multi-Purpose Building, Barangay Luyongbonbon, Opol, Misamis Oriental₱143,407,999.52
- Preventive Maintenance - Secondary Roads - Gingoog-Claveria-Villanueva Rd - K1318 + 705 - K1320 + 444, K1320 + 459 - K1322 + 215, K1322 + 482 - K1325 + 500₱143,302,446.76
- Preventive Maintenance - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1298 + 000 - K1301 + 210₱143,302,417.55
- Rehabilitation/ Reconstruction of Roads With Slips, Slope Collapse, and Landslide - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1398 + 300- K1398 + 600₱143,300,946.46
- Construction of Odiongan Bridge 2, Gingoog City, Misamis Oriental₱143,274,502.41
- Construction of Flood Control Structure Along Alubijid River Downstream of Alubijid Bridge (Right Side), Package 1, Alubijid, Misamis Oriental₱141,124,491.50
- Construction of Flood Control Structure Along Alubijid River Downstream of Alubijid Bridge (Left Side), Package 2, Alubijid, Misamis Oriental₱139,728,160.10
- Construction of Flood Control Structure Along Naawan River Upstream of Naawan Bridge (Right Side), Package 4, Naawan, Misamis Oriental₱137,507,828.50
- Construction of Flood Control Structure Along Naawan River Upstream of Naawan Bridge (Right Side), Package 3, Naawan, Misamis Oriental₱137,507,127.90
- Construction of Flood Control Structure Along Naawan River Downstream of Naawan Bridge (Left Side), Package 2, Naawan, Misamis Oriental₱137,503,763.40
- Construction of Flood Control Structure Along Naawan River Upstream of Naawan Bridge (Left Side), Package 6, Naawan, Misamis Oriental₱137,501,620.10
- Construction of Flood Control Structure Along Naawan River Upstream of Naawan Bridge (Left Side), Package 5, Naawan, Misamis Oriental₱137,497,779.30
- Construction of Flood Control Structure Along Naawan River Downstream of Naawan Bridge (Left Side), Package 1, Naawan, Misamis Oriental₱137,480,516.60
- Construction of Drainage System (Bonbon - Kauswagan Section), Package 12, Sta. 0+000.00 - Sta. 1+536.00, Cagayan de Oro City₱134,600,733.30
- Construction of Flood Control Structure at Manticao River (Downstream of Manticao Bridge) Manticao, Misamis Oriental₱129,000,000.00
- Construction of Flood Control Project Along Dangoan River (Downstream), K0+000.00 - K0+397.966, K0+767.565 - K1+101.000, Medina, Misamis Oriental₱126,308,189.90