Construction of Flood Control Structure along Alubijid River Downstream of Alubijid Bridge (Right Side), Package 1, Alubijid, Misamis Oriental
Construction of Flood Control Structure along Alubijid River Downstream of Alubijid Bridge (Right Side), Package 1, Alubijid, Misamis Oriental is a DPWH-tracked public work in ALUBIJID (MISAMIS ORIENTAL), MISAMIS ORIENTAL, Region X. Reported contract value: ₱141,124,491.50. Status: Reported complete (DPWH). Contractor on record: VEN RAY CONST CORP. Figures trace to sumbong.
Total Contract Cost