Construction of Flood Control Structure along Naawan River Upstream of Naawan Bridge (Right side), Package 4, Naawan, Misamis Oriental
Construction of Flood Control Structure along Naawan River Upstream of Naawan Bridge (Right side), Package 4, Naawan, Misamis Oriental is a DPWH-tracked public work in NAAWAN (MISAMIS ORIENTAL), MISAMIS ORIENTAL, Region X. Reported contract value: ₱137,507,828.50. Status: Reported complete (DPWH). Contractor on record: NORTHERN BUILDERS. Figures trace to sumbong.
Total Contract Cost
