Construction of Flood Control Structure along Naawan River Downstream of Naawan Bridge (Left Side), Package 2, Naawan, Misamis Oriental
Construction of Flood Control Structure along Naawan River Downstream of Naawan Bridge (Left Side), Package 2, Naawan, Misamis Oriental is a DPWH-tracked public work in NAAWAN (MISAMIS ORIENTAL), MISAMIS ORIENTAL, Region X. Reported contract value: ₱137,503,763.40. Status: Reported complete (DPWH). Contractor on record: TRIPARCO DEVELOPMENT CORP. Figures trace to sumbong.
Total Contract Cost
