CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE II, BARANGAY PALAO, BANGUED, ABRA
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE II, BARANGAY PALAO, BANGUED, ABRA is a DPWH-tracked public work in Abra DEO, Cordillera Administrative Region. Reported contract value: ₱91,675,962.53. Status: Past target date (DPWH On-Going). Contractor on record: 739 BUILDERS. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

