ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD-K0448+267-K0448+281, K0448+443-K044
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD-K0448+267-K0448+281, K0448+443-K044 is a DPWH-tracked public work in Abra DEO, Cordillera Administrative Region. Reported contract value: ₱6,221,701.05. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: 739 BUILDERS. Figures trace to dpwh.
Total Contract Cost

