Flood Control and Drainage17DE0043

LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF DIKE, MUNICIPALITY OF BAUAN, BATANGAS

LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF DIKE, MUNICIPALITY OF BAUAN, BATANGAS is a DPWH-tracked public work in Batangas 2nd DEO, Region IV-A. Reported contract value: ₱3,959,998.18. Status: Reported complete (DPWH). Contractor on record: W RIVERA CONST AND EQUIPT RENTALS INC FORMERLY: W RIVERA CONST. Figures trace to dpwh.

Batangas 2nd DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱2,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0011687 · · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17DE0043 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2013-04-07 → 2025-07-11

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Batangas

Based on the coordinates published with the DPWH record and NOAH file Batangas.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRASTRUCTURE PROGRAM  CONSTRUCTION OF DIKE, MUNICIPALITY OF BAUAN, BATANGAS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱2,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Improvement of Flood Control Facilities, Mainaga, Mabini, Batangas
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0011687

₱0.00 · FY2017

Released to Division of Tacloban T City t f (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

102 projects · ₱1.1B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY (COLISEUM) AT PANSOL, POBLACION 4, BAUAN, BATANGAS

Batangas 2nd DEO, Region IV-A

2023₱108.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COMMUNITY CENTER), SAN ISIDRO EVACUATION COMPLEX, BATANGAS CITY, BATANG

Batangas 2nd DEO, Region IV-A

2023₱49.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT SAN ISIDRO EVACUATION COMPLEX, BATANGAS CITY, BATANGAS

Batangas 2nd DEO, Region IV-A

2023₱49.5M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING, POBLACION 4, BAUAN, BATANGAS

Batangas 2nd DEO, Region IV-A

2021₱39.6M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT

Batangas 2nd DEO, Region IV-A

2020₱39.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF EVACUATION CENTER AT BRGY. LAUREL, SAN PASCUAL, BATANGAS PROVINCE

Region IV-A, Region IV-A

2018₱34.0M
Reported complete (DPWH)
View all 102 projects →

4. Implementation

Contract Amount

₱3,959,998.18

Progress

Reported complete (DPWH)

Start Date

August 14, 2017

Target End

February 4, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.