Flood Control and Drainage25DF0165

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF REVETMENT ALONG MALIMANGO RIVER, BRGY. BAGBAG I, ROSARIO, CAVITE (PHAS

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF REVETMENT ALONG MALIMANGO RIVER, BRGY. BAGBAG I, ROSARIO, CAVITE (PHAS is a DPWH-tracked public work in Cavite 1st DEO, Region IV-A. Reported contract value: ₱47,958,046.39. Status: Past target date (DPWH On-Going). Contractor on record: GROUND UP CONST AND SUPPLIES. Figures trace to dpwh.

Cavite 1st DEO, Region IV-A
Region: Region IV-A

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure (Revetment) along Ilang-Ilang River, Barangay Pasong Kawayan I, General Trias City, Cavite
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIII-25-0013383

₱15,322,000.00 · FY2025

Released to Cavite 1st DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

14 projects · ₱594.3M total · 0 flags

4. Implementation

Contract Amount

₱47,958,046.39

Progress

Past target date (DPWH On-Going)

Start Date

June 9, 2025

Target End

December 21, 2025

5. Audit