Buildings and Facilities24DQ0062

CONSTRUCTION OF 2-STOREY 8-CLASSROOM SCHOOL BUILDING IN REVILLA HIGH SCHOOL, BARANGAY MALIKSI 1, BACOOR CITY, CAVITE

CONSTRUCTION OF 2-STOREY 8-CLASSROOM SCHOOL BUILDING IN REVILLA HIGH SCHOOL, BARANGAY MALIKSI 1, BACOOR CITY, CAVITE is a DPWH-tracked public work in Cavite 3rd DEO, Region IV-A. Reported contract value: ₱25,805,238.65. Status: Past target date (DPWH On-Going). Contractor on record: SELPHAR CONST. Figures trace to dpwh.

Cavite 3rd DEO, Region IV-A
Region: Region IV-A

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Barangay Poblacion 4, Gen. Mariano Alvarez, Cavite
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIII-24-0016076

₱310,523,000.00 · FY2024

Released to Regional Office - III (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

30 projects · ₱1.2B total · 0 flags

Other projects by this contractor

CONSTRUCTION OF REVETMENT ALONG CARMONA RIVER (EAST AND WEST SIDE) AT BRGY. LANTIC, CARMONA, CAVITE

Cavite 3rd DEO, Region IV-A

2023₱99.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRA.PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCTURES ALONG MAASIM RIVER,BRGY. UPIG, SAN ILDEFONSO, BULACAN (UPSTREAM)

Bulacan 3rd DEO, Region III

2025₱97.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAMCONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONST OF REVETMENT ALONG IMUS RIVER,SEGMENT 2

Cavite 1st DEO, Region IV-A

2024₱95.5M
Reported complete (100% progress, DPWH status On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER, SAN MIGUEL,BULACAN

Region III, Region III

2023₱95.0M
Reported complete (DPWH)
No sat.

FLOOD CONTROL MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER, SAN MIGUEL, BULACAN

Region III, Region III

2023₱95.0M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCRUES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER, SAN MIGUEL, BULACAN

Region III, Region III

2023₱95.0M
Reported complete (100% progress, DPWH status On-Going)
View all 30 projects →

4. Implementation

Contract Amount

₱25,805,238.65

Progress

Past target date (DPWH On-Going)

Start Date

May 24, 2024

Target End

March 12, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.