Flood Control and Drainage23C00266

FLOOD CONTROL MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER, SAN MIGUEL, BULACAN

FLOOD CONTROL MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER, SAN MIGUEL, BULACAN is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱94,972,341.86. Status: Reported complete (DPWH). Contractor on record: SELPHAR CONST. Figures trace to dpwh.

Region III, Region III
Region: Region III
Skipped: this map coordinate is shared by many projects, so the pin may not mark the exact worksite.

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱94,972,342

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Low flood hazard · Bulacan

Based on the coordinates published with the DPWH record and NOAH file Bulacan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: FLOOD CONTROL MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER, SAN MIGUEL, BULACAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2023 GAA. DBM GAA FY2023

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

23C00266

₱94,972,341.86 · Awardee from PhilGEPS

Award / contract ref: 23C00266

Contractor

C

30 projects · ₱1.2B total · 0 flags

Other projects by this contractor

CONSTRUCTION OF REVETMENT ALONG CARMONA RIVER (EAST AND WEST SIDE) AT BRGY. LANTIC, CARMONA, CAVITE

Cavite 3rd DEO, Region IV-A

2023₱99.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRA.PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCTURES ALONG MAASIM RIVER,BRGY. UPIG, SAN ILDEFONSO, BULACAN (UPSTREAM)

Bulacan 3rd DEO, Region III

2025₱97.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAMCONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONST OF REVETMENT ALONG IMUS RIVER,SEGMENT 2

Cavite 1st DEO, Region IV-A

2024₱95.5M
Reported complete (100% progress, DPWH status On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER, SAN MIGUEL,BULACAN

Region III, Region III

2023₱95.0M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCRUES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER, SAN MIGUEL, BULACAN

Region III, Region III

2023₱95.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM SCHOOL BUILDING AT HABAY ELEMENTARY SCHOOL, BACOOR CITY,CAVITE

Region IV-A, Region IV-A

2018₱65.0M
Reported complete (DPWH)
View all 30 projects →

4. Implementation

Contract Amount

₱94,972,341.86

Progress

Reported complete (DPWH)

Start Date

October 9, 2023

Target End

July 4, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanSan MiguelBaritan
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Man-Yi 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.