DPWH transparency mirror

DPWH reports: Completed · 100%

Open DPWH portal record ↗

Publicly reported (according to cited sources)

  • Commission on Audit (fraud audit report to Ombudsman) · 2025-09-08

    “there is a P38.4 million discrepancy in pricing between the DPWH and the COA's evaluated cost”
    Source link (external) ↗
  • Commission on Audit (fraud audit report) · 2025-09-08

    “St. Timothy's P96.5-million and P39.2-million projects in Calumpit were also found defective, with dredging claims overstated, materials unverifiable”
    Source link (external) ↗
  • President Marcos (on-site inspection) · 2025-08-15

    “Marcos said the official documents tagged the flood control projects as already being finished, yet he did not see a functioning structure.”
    Source link (external) ↗

Publicly reported by the cited sources; not a finding by this site. Criminal or administrative charges, where cited, are described as pending unless the source states a final judgment. Right of reply / submit evidence

Rehabilitation / Major Repair of Slope Protection Structure22CC0058

Rehabilitation of River Protection Structure along Bulusan, Calumpit, Bulacan

Rehabilitation of River Protection Structure along Bulusan, Calumpit, Bulacan is a DPWH-tracked public work in CALUMPIT (BULACAN), BULACAN, Region III. Reported contract value: ₱96,498,200.70. Status: Reported complete (DPWH). Contractor on record: ST TIMOTHY CONST CORP. Figures trace to sumbong.

CALUMPIT (BULACAN), BULACAN, Region III
Region: Region III

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Structure along Balagtas River (Longos Section), Balagtas, Bulacan
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002958

₱2,583,500,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002898

₱71,500,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0000929

₱84,820.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

NCA NCA-ROIII-22-0005486

₱1,178,247.00 · FY2022

Released to Pampanga National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

F

942 projects · ₱44.1B total · 42 flags

Other projects by this contractor

No sat.

REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, MANILA NORTH RD - K0578+640 - K0578+900 R/S

Region I, Region I

2023₱390.8M
Reported complete (DPWH)
No sat.

CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS &/OR BRIDGES FR. THE NAT'L. ROAD/S LEAD. TO MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, BRGY. LIYANG, PILAR TO BRGY. BILOLO (PHASE 1), ORION, BATAA

Region III, Region III

2024₱305.7M
Past target date (DPWH On-Going)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD AND CAUSEWAY FOR TOURISM ALONG AZAGRA PORT, CAJIDIOCAN, SIBUYAN ISLAND, ROMBLON

Region IV-B, Region IV-B

2023₱289.5M
Reported complete (DPWH)
No sat.

CLUSTER 12: CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, ORIENTAL MINDORO, 12.1: CONST. OF BALITE R/C, BRGY. MALAMIG SECT., STA. 0+000-STA. 0+308.60; 12.2: CONST. OF CAWACAT R/C, TABUK SECT., BULALACAO, STA.0+000-STA. 0+324.3; 1

Region IV-B, Region IV-B

2022₱289.5M
Past target date (DPWH On-Going)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG CAJIDIOCAN PORT, SIBUYAN ISLAND, ROMBLON

Region IV-B, Region IV-B

2023₱289.5M
Reported complete (DPWH)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG POBLACION SAN FERNANDO, SIBUYAN ISLAND, ROMBLON

Region IV-B, Region IV-B

2023₱289.5M
Reported complete (DPWH)
View all 942 projects →

4. Implementation

Contract Amount

₱96,498,200.70

Progress

Reported complete (DPWH)

Start Date

February 18, 2022

Target End

February 12, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.