Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Bulacan 1st District Engineering Office awarded 436 of 452 recorded flood-control contracts (96.5%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (26.1 percentage points higher; binomial p = 1.5e-46), across 93 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from consistently competitive bidding or precise cost estimation practices.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Bulacan 1st District Engineering Office: contracts
436 of 452 contracts (96.5%) at ≥99.5% of ABC · peer baseline 70.4% · gap +26.1 pts · binomial p = 1.5e-46. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 23CC0212 | Construction of Flood Control Structure along Bagbag Creek, Barangay Sta. Cruz, Guiguinto, Bulacan (K003+772 to K003+922) | A R L CONST | 101.55% | DPWH |
| 23CC0280 | Construction of Flood Control Project and Rehabilitation of Waterways along Angat River Brgy. Parulan Plaridel, Bulacan | DOUBLE 12 CONST & SUPPLY | 101.02% | DPWH |
| 22CC0281 | Rehabilitation of Flood Structure along Barangay Pinagbarilan, Baliwag, Bulacan | I F CLEMENTE CONST CORP | 100.02% | DPWH |
| 23CC0410 | Construction of Flood Control Structure (riprapping) Barangay Igulot, Bocaue, Bulacan | RVR3 CONST SUPPLY AND SERVICES | 100.01% | DPWH |
| 22CC0282 | Rehabilitation of Flood Control Structure along Barangay Pinagbarilan, Baliuag, Bulacan | I F CLEMENTE CONST CORP | 100.00% | DPWH |
| 22CC0139 | Construction of Drainage Canal along Barangays Subic, Tibag and Sabang, Baliuag, Bulacan | WBX CONST INC FORMERLY WBX CONST | 100.00% | DPWH |
| 23CC0055 | Construction of Flood Control Structure along Angat River at Parulan Section, Plaridel, Bulacan | S A PLEYTO CONST CORP | 100.00% | DPWH |
| 21CC0200 | Construction of Flood Mitigation Structure along Barangay Angat River, Calumpit, Bulacan | RVR3 CONST SUPPLY AND SERVICES | 100.00% | DPWH |
| 22CC0271 | Improvement of Waterway and Flood Control Structure along Balagtas River (Tributary) Brgy. Panginay to Wawa, Balagtas, Bulacan | R2A CONST & TRADING CORP | 100.00% | DPWH |
| 23CC0041 | Construction of Flood Control Structure along Guiguinto River, Poblacion, Guiguinto, Bulacan | TIONGCO MENDOZA CONST CO INC | 100.00% | DPWH |
| 21CC0170 | Improvement of Waterways and Construction of Flood Control Structures along Bocaue River (Lolomboy Section), Sta. 06+446 - Sta. 06+533, Bocaue, Bulacan | GENUINE BUILDERS | 100.00% | DPWH |
| 22CC0308 | Construction of Flood Control Structure including outfall along Barangay Virgen Delos Flores, Sta. Barbara and Tiaong, Baliuag, Bulacan | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 23CC0034 | Construction of Drainage Canal, Makinabang, Baliuag, Bulacan | DOUBLE Z CONST AND SUPPLY | 100.00% | DPWH |
| 22CC0144 | Rehabilitation of River Control Structures, Malis (Bagbag Creek), Guiguinto, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 22CC0124 | Construction of Flood Control Structures along Bocaue River, K003 + 593.60 - K003 + 850, Bunlo, Bocaue, Bulacan | BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 22CC0005 | Construction of River Protection along Barangay Dampol II-B, Pulilan, Bulacan | A C SOLIVEN CONST & GEN MERCHANDISE | 100.00% | DPWH |
| 22CC0258 | Construction of Flood Control Structure, Brgy. Tangos, Baliuag, Bulacan | STAR WILLIAM CONST | 100.00% | DPWH |
| 22CC0168 | Construction of Flood Control Structure and Improvement of Waterways at Brgy. Hinukay, Baliuag, Bulacan | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 22CC0158 | Construction of Flood Control Wall, Poblacion, Guiguinto, Bulacan, Sta. 0+157-Sta.0+301 | F R MAPILISAN CONST | 100.00% | DPWH |
| 23CC0062 | Construction of Flood Control Structure along Bagbag Creek, Pritil Section, Guiguinto, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 22CC0269 | Construction of Riverbank Protection along Angat River Culianin to Cambaog, Plaridel, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 23CC0216 | Construction of Flood Control Structure along Bagbag Creek, Barangay Pritil, Guiguinto, Bulacan (K003+220 to K003+420) | M S RAMOS CONST INC FORMERLY: M S RAMOS | 100.00% | DPWH |
| 22CC0293 | Construction of Flood Control Structure, Barangay Hinukay, Baliuag, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 23CC0084 | Construction of River Control Project along Bocaue River, Bambang Section, Sta. 08+790 to Sta. 08+995, Bocaue, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0094 | Rehabilitation of Waterways and Construction of Concrete Slope Protection with Steel Sheet Piles along Bocaue River, K009 + 840 to K009 + 990, Bambang, Bocaue, | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 22CC0226 | Construction of Flood Control Structure along Guiguinto River (Sta. 1+ 036 to Sta. 1+ 338), Barangay Daungan, Guiguinto, Bulacan | STAR WILLIAM CONST | 100.00% | DPWH |
| 23CC0271 | Construction of Revetment along Hagonoy River at Barangay Santo Rosario, Hagonoy, Bulacan | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 23CC0078 | Construction of Concrete Revetment along Balagtas River Sta. 14 + 780 - Sta. 14 + 985, Panginay Section, Balagtas, Bulacan | RDBT CONST CORP / C B GARAY PHILWIDE BUILDERS | 100.00% | DPWH |
| 22CC0035 | Construction of Flood Control Structure along Balagtas River (Sta. 0 + 776 to Sta. 1 + 372), Barangay Panginay, Balagtas, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 23CC0163 | Construction of River Control Project along Angat River, Tanawan Section, Sta. 03+610 - Sta. 04+010, Bustos, Bulacan | JTC CRUZ CONST CO INC | 100.00% | DPWH |
| 23CC0079 | Construction of Concrete Slope Protection along Bocaue River Igulot Section (Tributary), K007 + 510 - K007 + 660, Bocaue, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0090 | Construction of River Control Project along Balagtas River, San Juan, Sta. 09+600 - Sta. 09+805, Balagtas, Bulacan | A R L CONST | 100.00% | DPWH |
| 23CC0003 | Construction of Flood Control Structure along Barangay Panasahan, Malolos City, Bulacan | M G FRANCISCO CONST | 100.00% | DPWH |
| 22CC0123 | Construction of Drainage Canal along Barangays Concepcion, Santo Cristo, Virgen Delas Flores and San Jose, Baliuag, Bulacan | C & F CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 23CC0097 | Construction of River Control Project along Bocaue River, Igulot Section (Tributary), Sta. 05+280 to Sta. 05+610, Bocaue, Bulacan | WAWAO BUILDERS / SYMS CONST TRADING | 100.00% | DPWH |
| 23CC0092 | Construction of River Control Project along Balagtas River, Panginay (LS), Sta. 13+090 - Sta. 13+295, Balagtas, Bulacan | AZUL BUILDERS / JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 23CC0383 | Construction of Flood Mitigation Structure at barangay Frances (Phase II), Calumpit, Bulacan | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 23CC0316 | Construction of Flood Control Project and Rehabilitation of Waterways along Bocaue River Brgy. Bambang Bocaue, Bulacan | M S RAMOS CONST INC FORMERLY: M S RAMOS | 100.00% | DPWH |
| 23CC0085 | Construction of Riverwall along Guiguinto River, Daungan Section, Sta. 03+060 to Sta. 03+420, Guiguinto, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 24CC0159 | Rehabilitation of Ugong Creek, Guiguinto, Bulacan | A L SALAZAR CONST INC | 100.00% | DPWH |
| 23CC0159 | Construction of Flood Mitigation Structure, Sagrada Familia, Hagonoy, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 23CC0126 | Construction of Flood Mitigation Structures along Barangay Bambang, Bulacan, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0120 | Construction of Revetment at Iba, Hagonoy, Bulacan | MICHARIAN BUILDERS AND TRADING | 100.00% | DPWH |
| 24CC0421 | Construction of Reinforced Concrete Flood Control Structure along Angat River, San Jose Section, Plaridel, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 22CC0290 | Construction of Riverbank Protection along Angat River Brgy. Tarcan Baliuag, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 23CC0002 | Construction of Flood Control Structure along Barangay Panducot, Calumpit, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 22CC0145 | Rehabilitation of River Control Structures, Sta. Cruz (Bagbag Creek), Guiguinto, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 23CC0181 | Construction of Flood Control Structure, Brgy. San Roque, Hagonoy, Bulacan | RVR3 CONST SUPPLY AND SERVICES | 100.00% | DPWH |
| 22CC0324 | Construction of Flood Control Structure Pritil Section, Guiguinto, Bulacan, Sta. 00 + 370 - Sta. 00 + 674 | M S RAMOS CONST INC FORMERLY: M S RAMOS | 100.00% | DPWH |
| 23CC0005 | Construction of Flood Mitigation Structures along Barangay Babatnin, Malolos, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0086 | Improvement of Waterways and Construction of Concrete Revetment along Angat River Bonga Menor Section, K000 + 0000 - K000 + 130, Bustos, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0030 | Construction of Flood Mitigation Structures along Barangay Taal, Pulilan, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0031 | Construction of Flood Mitigation Structures along Barangay Santo Cristo, Pulilan, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0124 | Construction of Flood Mitigation Structures along Barangay Matungao, Bulacan, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 22CC0187 | Construction of Riverbank Protection along Balagtas River Brgy. Santol, Balagtas, Bulacan | 729 CONST INC FORMERLY 722 CONST INC | 100.00% | DPWH |
| 23CC0381 | Construction of Flood Mitigation Structure at barangay Meyto (Phase II), Calumpit, Bulacan | RVR3 CONST SUPPLY AND SERVICES | 100.00% | DPWH |
| 23CC0182 | Construction of Flood Control Structures and Improvement of Waterways along Barangay Bulusan, Calumpit, Bulacan | IM CONST CORP | 100.00% | DPWH |
| 23CC0310 | Construction of Revetment along Hagonoy River and its Tributaries at Barangay Santa Elena, Hagonoy, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0103 | Construction of Flood Mitigation Structures along Barangay San Juan, Hagonoy, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0102 | Construction of Flood Mitigation Structures along Barangay San Agustin, Hagonoy, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 24CC0157 | Construction of Waterways and Flood Control Structure along Guiguinto River, Brgy. Malis, Guiguinto, Bulacan | RJR CALCON CORP | 100.00% | DPWH |
| 23CC0008 | Construction of Flood Mitigation Structures along Barangay Matimbo, Malolos, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 22CC0096 | Construction of Slope Protection Structures at Guiguinto River (Bagbag Creek, Sta. 0 + 000 - Sta. 0 + 780), Barangay Malis, Guiguinto, Bulacan | A R L CONST | 100.00% | DPWH |
| 23CC0108 | Construction of Flood Mitigation Structures along Barangay San Miguel, Hagonoy, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0156 | Construction of Flood Mitigation Structures along Barangay Bulusan, Calumpit, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0099 | Construction of River Control Project along Guiguinto River, Barangay Malis, Sta. 02+250 - Sta. 02+610, Guiguinto, Bulacan | A R L CONST | 100.00% | DPWH |
| 22CC0234 | Construction of Flood Control Structure, Sta. 01 + 120 - Sta. 01 + 270, Brgy. Piel, Baliuag, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0109 | Construction of Flood Mitigation Structures along Barangay San Nicolas, Hagonoy, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0110 | Construction of Flood Mitigation Structures along Barangay San Pablo, Hagonoy, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0239 | Construction (Improvement) of Slope Protection Structure and Waterways at Barangay Mambog, Malolos City, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 24CC0184 | Construction/mprovement of Flood Mitigation Structure at Tampok, Hagonoy, Bulacan | 11-16 CONST | 100.00% | DPWH |
| 23CC0217 | Construction of River Protection along Bocaue River, K001 + 370 to K001 + 570, barangay Taal, Bocaue, Bulacan | 11-16 CONST / BOLTRON BUILDERS CORP | 100.00% | DPWH |
| 22CC0182 | Construction of Flood Control Structure and Improvement of Waterways at Brgy. Sulivan, Baliuag, Bulacan | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 22CC0072 | Improvement of Waterways with Flood Control Structures along Balagtas River, Sta. 0 + 000 to Sta. 0 + 540, Wawa, Balagtas, Bulacan | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 24CC0263 | Construction of Reinforced Concrete Flood Control Structure, Barangay Matungao, Bulakan, Bulacan | WBX CONST INC FORMERLY WBX CONST | 100.00% | DPWH |
| 21CC0126 | Construction of Angat River Flood Control Structure and its Tributaries at Sto. Niño, Paombong, Bulacan, Sta. 00+445 - Sta. 00+641 | STAR WILLIAM CONST | 100.00% | DPWH |
| 23CC0145 | Construction of Riverwall along Angat River, Tanawan Section, Sta. 04+020 to Sta. 04+420, Bustos, Bulacan | JTC CRUZ CONST CO INC | 100.00% | DPWH |
| 23CC0123 | Construction of Flood Mitigation Structures along Barangay Frances, Calumpit, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 21CC0292 | Construction of Flood Control Structures along Bocaue River, Bocaue, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0192 | Construction of Reinforced Concrete Flood Control Structure, Barangay Sagrada Familia (Purok 4 to Purok 5), Hagonoy, Bulacan | SYMS CONST TRADING | 100.00% | DPWH |
| 23CC0230 | Construction of Revetment along Pampanga River at Barangay Meyto, Calumpit, Bulacan | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 23CC0105 | Construction of Flood Mitigation Structures along Barangay Sta. Lucia, Calumpit, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0125 | Construction of Flood Mitigation Structures along Barangay Bagumbayan, Bulacan, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 24CC0054 | Construction of Slope Protection Structure and Waterways, Barangay Daungan, Guiguinto, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BEAM TEAM DEVELOPER SPECIALIST INC | 100.00% | DPWH |
| 22CC0157 | Construction of Flood Control Structure along Angat River (Sta. 0+ 672 - Sta. 1 + 007), Poblacion and Sabang Section, Bustos and Baliuag, Bulacan | JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 22CC0034 | Rehabilitation of River Control Structures along Bocaue River, Bambang, Bocaue, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 22CC0038 | Rehabilitation of River Control Structures along Bocaue River, Sulucan, Bocaue, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 22CC0294 | Construction of Flood Control Structure along Angat River, Lumangbayan Section, Sta. 00 + 576 to Sta. 00 + 991, Plaridel, Bulacan | AZUL BUILDERS / JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 22CC0250 | Bank Improvement along Angat River, Sta. 0 + 525 to Sta. 0 + 895, Brgy. Sulivan, Baliuag, Bulacan | DMLC BUILDERS | 100.00% | DPWH |
| 22CC0257 | Construction of Flood Control Structure and Improvement of Waterways at Brgy. Piel, Baliuag, Bulacan | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 24CC0468 | Construction of Flood Control Structure along Angat River, Lumbang Bayan Section, Plaridel, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0058 | Construction of Concrete Slope Protection at Barangay Hinukay, K004 + 100 - K004 + 300, Baliuag, Bulacan | JUSTBILT BUILDERS | 100.00% | DPWH |
| 23CC0151 | Construction of Revetment Wall at Barangay Tangos, Sta. 01+120 to Sta. 01+520, Baliuag, Bulacan | M S RAMOS CONST INC FORMERLY: M S RAMOS | 100.00% | DPWH |
| 24CC0055 | Construction of Riverbank Protection Structure at Barangay Malis (Phase III), Guiguinto, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 22CC0057 | Construction Of River Protection - Malumot, Paombong, Bulacan | J SIMEON CONST | 100.00% | DPWH |
| 24CC0144 | Construction of Flood Control Structure along Angat River, Sipat Section, Plaridel, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0146 | Construction of River Control Project at Barangay Pagala, Sta. 00+500 to Sta. 00+900, Baliuag, Bulacan | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 24CC0087 | Construction of Riverbank Protection Structure at Barangay Batbatnin, Malolos City, Bulacan | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 24CC0195 | Construction of Reinforced Concrete Flood Control Structure, Barangay Santa Monica (Purok 6 to Purok 7), Hagonoy, Bulacan | SYMS CONST TRADING | 100.00% | DPWH |
| 24CC0008 | Construction of Riverbank Protection Structure at Barangay Anilao, Malolos City, Bulacan | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 24CC0007 | Construction of Riverbank Protection Structure at Barangay Abulalas, Hagonoy, Bulacan | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 24CC0015 | Construction of Riverbank Protection Structure at Barangay Mambog, Malolos City, Bulacan | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 22CC0266 | Rehabilitation of Flood Control Structure along Angat River, Poblacion to Lumang Bayan Section, Plaridel, Bulacan | TBB CONST CORP | 100.00% | DPWH |
| 24CC0142 | Construction of Flood Control Structure along Guiguinto River, Malis Section, Guiguinto, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 24CC0448 | Construction/Improvement of Slope Protection Structure and Waterways, Brgy. San Vicente, Malolos City, Bulacan | TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC | 100.00% | DPWH |
| 24CC0399 | Construction of Flood Control Structure, Barangay San Juan, Wawa, and Panginay, Balagtas, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 22CC0272 | Construction of Spur Dike along Angat River, Talampas and Sta. Barbara Section, Sta. 00 + 672 - Sta. 01 + 007 | A R L CONST | 100.00% | DPWH |
| 24CC0181 | Constructionmprovement of Flood Mitigation Structure at Carillo, Hagonoy, Bulacan | 11-16 CONST | 100.00% | DPWH |
| 24CC0006 | Construction of Riverbank Protection Structure along Balagtas River, Barangay San Juan, Balagtas, Bulacan | JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 22CC0247 | Construction of Slope Protection along Bocaue River, Sta. 2 + 159 to Sta. 2 + 439, Bambang Section, Bocaue, Bulacan | JTC CRUZ CONST CO INC | 100.00% | DPWH |
| 22CC0213 | Construction of Riverbank Protection along Bocaue River Brgy. Taal Bocaue, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 23CC0137 | Construction of Flood Mitigation Structures along Barangay Sta. Elena, Hagonoy, Bulacan | ALL EML CONST CORP FORMERLY: E M L CONST & TRADING | 100.00% | DPWH |
| 24CC0042 | Construction of Riverbank Protection Structure at Barangay Sulivan, Baliuag, Bulacan | IM CONST CORP | 100.00% | DPWH |
| 24CC0329 | Construction of Reinforced Concrete Flood Control Structure, Barangay Maysantol, Bulakan, Bulacan | FLORDES CONST & TRADING CORP FORMERLY FLO | 100.00% | DPWH |
| 24CC0261 | Construction of Flood Control Structure, Barangay Atlag, Malolos City, Bulacan | SYMS CONST TRADING | 100.00% | DPWH |
| 24CC0073 | Construction of Revetment at Barangay Santo Niño, Calumpit, Bulacan | PTM DEVELOPMENT CORP | 100.00% | DPWH |
| 24CC0422 | Construction of Reinforced Concrete Flood Control Structure along Angat River, Bintog Section, Plaridel, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0173 | Construction of Reinforced Concrete Flood Control Structure at Barangay Sulivan (Purok 3), Baliuag, Bulacan | PRECIOUS CONST | 100.00% | DPWH |
| 23CC0197 | Construction of Flood Mitigation Structure protecting Public Infrastructures and Rehabilitation of Waterways at barangay Santo Nino, Calumpit, Bulacan | FERDSTAR BUILDERS INC | 100.00% | DPWH |
| 22CC0236 | Construction of Major River System, Angat River, Culianin and Makinabang Section, Sta. 00 + 632 to Sta. 01 + 007, Plaridel/Baliwag, Bulacan | A R L CONST | 100.00% | DPWH |
| 23CC0150 | Construction of Riverwall at Barangay Tangos, Sta. 00+710 to Sta. 001+110, Baliuag, Bulacan | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 100.00% | DPWH |
| 24CC0074 | Construction of Revetment at Barangay Santo Niño-Pungo, Calumpit, Bulacan | PTM DEVELOPMENT CORP | 100.00% | DPWH |
| 22CC0278 | Rehabilitation of Balagtas River Control Structure, Sta. 02+272 to Sta. 02+664, Brgy. Dalig, Balagtas, Bulacan | 729 CONST INC FORMERLY 722 CONST INC | 100.00% | DPWH |
| 24CC0264 | Construction of Reinforced Concrete Flood Control Structure, Barangay Atlag, Malolos City, Bulacan | SYMS CONST TRADING | 100.00% | DPWH |
| 24CC0040 | Construction of Riverbank Protection Structure at Barangay Piel, Baliuag, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 22C00075 | Construction of Flood Control Structure Along Ciudad De Victoria Tributaries leading to Bocaue River (Igulot Section) Bocaue, Bulacan | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 24CC0262 | Construction of Reinforced Concrete Flood Control Structure along Kalero River and its tributaries, Barangay Calero, Malolos, Bulacan | C & F CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24CC0083 | Construction of Riverbank Protection Structure along Angat River (Phase II), Barangay Parulan, Plaridel, Bulacan | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 100.00% | DPWH |
| 24CC0199 | Construction of Reinforced Concrete Slope Revetment at Barangay Tikay, Malolos City, Bulacan | SYMS CONST TRADING | 100.00% | DPWH |
| 24CC0004 | Construction of Riverbank Protection Structure along Balagtas River, Barangay Pulong Gubat, Balagtas, Bulacan | A R L CONST | 100.00% | DPWH |
| 24CC0163 | Construction of River Control Structure at Barangay Pritil Purok 1 to Purok 2, Guiguinto, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0077 | Construction of Riverbank Protection Structure along Angat River, Barangay Banga II, Plaridel, Bulacan | BELL CONST | 100.00% | DPWH |
| 23CC0284 | Construction of Flood Control Structure at Barangay Pagala, Baliuag, Bulacan (K005+681 to K005+981) | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 23CC0010 | Construction of Flood Control Structure along Barangay Bagna, Malolos, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0253 | Construction of Flood Control Structure at Barangay Tangos, Baliuag, Bulacan (K003+200 to K003+500) | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 100.00% | DPWH |
| 23CC0091 | Construction of River Control Project along Balagtas River, Panginay, Sta. 16+310 - Sta. 16+515, Balagtas, Bulacan | A R L CONST | 100.00% | DPWH |
| 24CC0011 | Construction of Riverbank Protection Structure at Barangay Carillo, Hagonoy, Bulacan | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 22CC0107 | Construction of Flood Control Structures along Balagtas River, K0008 + 176.20 - K0008 + 431.80, Balagtas, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 22CC0289 | Construction of Flood Control Structure along Angat River, Sta. 0 + 413 - Sta. 0 + 738, Tibagan Section, Bustos, Bulacan | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 100.00% | DPWH |
| 24CC0009 | Construction of Riverbank Protection Structure at Barangay Atlag, Malolos City, Bulacan | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 23CC0142 | Construction of Concrete Slope Protection along Guiguinto River Tabang (Tributary) Section, K002 + 850 - K003 + 210, Guiguinto, Bulacan | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 100.00% | DPWH |
| 23CC0075 | Construction of Riverwall along Balagtas River, Panginay (Tributary Section) Sta. 15+270 to Sta. 15+475, Balagtas, Bulacan | AZUL BUILDERS / JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 24CC0088 | Construction of Reinforced Concrete Slope Revetment at Barangay Piel, Baliuag, Bulacan | S-ANG CONST & GEN TRADING INC / C T LEONCIO CONST & TRADING | 100.00% | DPWH |
| 23CC0004 | Construction of Flood Control Structure along Barangay Sapang Bayan, Calumpit, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 22CC0095 | Construction of Flood Control Structure at Guiguinto River (Bagbag Creek, Sta. 0 + 000 - Sta. 0 + 780), Barangay Malis, Guiguinto Bulacan | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 23CC0323 | Construction of River Protection along Angat River, K008 + 210 to K008 + 360, barangay San Jose, Baliuag, Bulacan | CEDAR CONST | 100.00% | DPWH |
| 23CC0322 | Construction of Flood Control Structure along Bocaue River, Barangay Bambang, Bocaue, Bulacan (K011+490 to K011+640) | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 23CC0190 | Construction of Revetment, Brgy. San Pascual, Hagonoy, Bulacan | FLORDES CONST & TRADING CORP FORMERLY FLO | 100.00% | DPWH |
| 23CC0133 | Construction of Revetment Wall at Barangay Hinukay, Sta. 02+780 to Sta. 03+180, Baliuag, Bulacan | M S RAMOS CONST INC FORMERLY: M S RAMOS | 100.00% | DPWH |
| 23CC0274 | Construction of River Protection along Angat River, K015 + 670 to K015 + 820, Parulan, Plaridel, Bulacan | FERDSTAR BUILDERS INC | 100.00% | DPWH |
| 23CC0251 | Construction of Flood Control Structure at Barangay Tangos, Baliuag, Bulacan (K003+961 to K004+261) | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 100.00% | DPWH |
| 24CC0068 | Construction of Flood Mitigation Structure and Improvement of Waterways along Bocaue River, Barangay Bambang, Bocaue, Bulacan | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 100.00% | DPWH |
| 23CC0246 | Construction of Flood Mitigation Structures along Bgry. Sto. Nino, Malolos, Bulacan | DMLC BUILDERS | 100.00% | DPWH |
| 24CC0022 | Construction of Riverbank Protection Structure at Barangay Sapang Bayan, Calumpit, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0192 | Construction of Flood Control Facility, Brgy. Sagrada Familia, Hagonoy, Bulacan | FLORDES CONST & TRADING CORP FORMERLY FLO | 100.00% | DPWH |
| 24CC0290 | Construction/Improvement of Slope Protection Structure and Waterways, Brgy. Pritil, Guiguinto, Bulacan | TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC | 100.00% | DPWH |
| 23CC0080 | Construction of Drainage Canal along San Simon, K0073 + (-558) - K0074 + 900, Baliuag, Bulacan | GDL CONST | 100.00% | DPWH |
| 24CC0396 | Construction of Reinforced Concrete Flood Control Structure along Angat River, Culianin Section (Purok 2), Plaridel, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0423 | Construction of Flood Control Structure along Angat River, Bulacan | 729 CONST INC FORMERLY 722 CONST INC | 100.00% | DPWH |
| 24CC0080 | Construction of Riverbank Protection Structure along Angat River, Barangay Poblacion, Plaridel, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0088 | Construction of River Control Project along Balagtas River, Panginay (Tributary), Sta. 15+060 - Sta. 15+265, Balagtas, Bulacan | A R L CONST | 100.00% | DPWH |
| 23CC0157 | Construction of Riverwall at Barangay Pagala, Sta. 00+910 to Sta. 01+310, Baliuag, Bulacan | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 100.00% | DPWH |
| 24CC0041 | Construction of Riverbank Protection Structure at Barangay Sulivan (Phase II), Baliuag, Bulacan | IM CONST CORP | 100.00% | DPWH |
| 24CC0043 | Construction of Revetment along Balagtas River, Santol, Balagtas, Bulacan | M G FRANCISCO CONST | 100.00% | DPWH |
| 23CC0369 | Construction of Flood Control Structure at Barangay Tilapayong, Baliuag, Bulacan (K000+972.20 to K001+183.4) | R D TALENS CONST AND TRADING / I F CLEMENTE CONST CORP | 100.00% | DPWH |
| 23CC0370 | Construction of Flood Control Structure at Barangay Tilapayong, Baliuag, Bulacan (K000+761 to K000+972.2) | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 24CC0395 | Construction of Reinforced Concrete Flood Control Structure along Angat River, Culianin Section, Plaridel, Bulacan | TBB CONST CORP | 100.00% | DPWH |
| 23CC0095 | Rehabilitation of Waterways and Construction of Water Pumping Station at Barangay Malis, Guiguinto, Bulacan | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 23CC0277 | Construction of Flood Control Structure along Angat River, Barangay Lumang Bayan Plaridel, Bulacan (K019+931 to K020+231) | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0003 | Construction of Riverbank Protection Structure along Balagtas River (Phase II), Barangay San Juan, Balagtas, Bulacan | JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 24CC0198 | Construction of Reinforced Concrete Slope Revetment at Barangay Bulihan, Malolos City, Bulacan | SYMS CONST TRADING | 100.00% | DPWH |
| 24CC0079 | Construction of Riverbank Protection Structure along Angat River, Barangay Lumang Bayan, Plaridel, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0085 | Construction of Riverbank Protection Structure along Angat River, Barangay Bintog, Plaridel, Bulacan | BELL CONST | 100.00% | DPWH |
| 24CC0093 | Construction of Reinforced Concrete Slope Revetment at Barangay San Roque, Baliuag, Bulacan | S-ANG CONST & GEN TRADING INC / C T LEONCIO CONST & TRADING | 100.00% | DPWH |
| 22CC0113 | Construction of Flood Control Structures (Revetment) along Bocaue River, Barangay Binang 2nd, Bocaue, Bulacan | M G FRANCISCO CONST | 100.00% | DPWH |
| 23CC0131 | Construction of Revetment Wall at Barangay Piel, Sta. 01+820 to Sta. 02+220, Baliuag, Bulacan | M S RAMOS CONST INC FORMERLY: M S RAMOS | 100.00% | DPWH |
| 24CC0045 | Construction of Riverbank Protection Structure (Phase II) at Barangay Piel, Baliuag, Bulacan | L R TIQUI BUILDERS INC / M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 24CC0169 | Construction of Reinforced Concrete Flood Control Structure at Barangay Piel (Purok 3 to Purok 5), Baliuag, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 23CC0129 | Construction of River Control Project at Barangay Piel, Sta. 01+000 to Sta. 01+400, Baliuag, Bulacan | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 23CC0061 | Construction of Slope Protection at Hinukay, Sta. 00 + 150 to Sta. 00 + 350, Baliuag, Bulacan, | MRRM TRADING & CONST / GDL CONST | 100.00% | DPWH |
| 24CC0149 | Construction/Improvement of Slope Protection Structure and Waterways, Brgy. Bambang, Bocaue, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BEAM TEAM DEVELOPER SPECIALIST INC | 100.00% | DPWH |
| 24CC0078 | Construction of Riverbank Protection Structure along Angat River, Barangay Cambaog, Bustos, Bulacan | J SIMEON CONST | 100.00% | DPWH |
| 23CC0022 | Construction of Flood Mitigation Structures along Barangay San Isidro I, Paombong, Bulacan | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 100.00% | DPWH |
| 23CC0208 | Construction of River Protection along Balagtas River, K001 + 260 to K001 + 460, barangay Pulong Gubat, Balagtas, Bulacan | 11-16 CONST | 100.00% | DPWH |
| 23CC0121 | Construction of Revetment at San Jose, Paombong, Bulacan | EL KAPITAN CONST SERVICES | 100.00% | DPWH |
| 23CC0042 | Construction of Flood Control Structure along Guiguinto River, Daungan, Guiguinto, Bulacan | D C SANDIL CONST AND REALTY DEVELOPMENT I | 100.00% | DPWH |
| 24CC0298 | Construction/Improvement of Slope Protection Structure and Waterways, Brgy. Bunsuran, Pandi, Bulacan | TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC | 100.00% | DPWH |
| 22CC0091 | Rehabilitation of Major River System with Flood Control Structure at Bulusan, Calumpit, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0082 | Construction of Riverwall along Angat River, Tiaong Section, Sta. 08+710 to Sta. 09+040, Baliuag, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 23CC0320 | Construction of River Protection along Angat River, K009 + 520 to K009 + 670, Tiaong, Baliuag, Bulacan | CEDAR CONST | 100.00% | DPWH |
| 24CC0150 | Construction/Improvement of Slope Protection Structure and Waterways, Brgy. Sta. Cruz, Guiguinto, Bulacan | TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC | 100.00% | DPWH |
| 24CC0069 | Construction of Flood Mitigation Structure and Improvement of Waterways along Guiguinto River, Barangay Daungan, Guiguinto, Bulacan | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 100.00% | DPWH |
| 24CC0402 | Construction/Improvement of Slope Protection Structure and Waterways along Bocaue River, Brgy. Bambang (Sitio Bakod To Purok 6), Bocaue, Bulacan | TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC | 100.00% | DPWH |
| 23CC0224 | Construction of Flood Control Structure along Balagtas River, Panginay (LS), Balagtas, Bulacan (K014+770 to K014+920) | M S RAMOS CONST INC FORMERLY: M S RAMOS | 100.00% | DPWH |
| 24CC0005 | Construction of Riverbank Protection Structure along Balagtas River, Barangay Dalig, Balagtas, Bulacan | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 100.00% | DPWH |
| 23CC0083 | Construction of River Control Project along Angat River, Tiaong Section. Sta. 08+370 to Sta. 08+700, Baliuag, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 24CC0166 | Construction of Reinforced Concrete Flood Control Structure along Balagtas River, Barangay Dalig (Purok 2 to Purok 3), Balagtas, Bulacan | MRB11 CONST CORP FORMERLY:MRB CONS | 100.00% | DPWH |
| 23CC0276 | Construction of Flood Control Structure along Angat River, Barangay Parulan Plaridel, Bulacan (K016+331 to K016+631) | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 100.00% | DPWH |
| 23CC0228 | Construction of Revetment along Kalero River at Barangay Calero, Malolos City, Bulacan | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 100.00% | DPWH |
| 24CC0031 | Construction of Riverbank Protection Structure at Barangay Wawa (Tributary), Balagtas, Bulacan | FLORDES CONST & TRADING CORP FORMERLY FLO | 100.00% | DPWH |
| 24CC0170 | Construction of Reinforced Concrete Flood Control Structure at Barangay San Roque (Purok 3 to Purok 5), Baliuag, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 24CC0297 | Construction of Slope Protection Structure and Waterways, Brgy. Bunsuran (Purok 4), Pandi, Bulacan | TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC | 100.00% | DPWH |
| 24CC0049 | Construction of Riverbank Protection Structure at Barangay Manatal, Pandi, Bulacan | FLORDES CONST & TRADING CORP FORMERLY FLO | 100.00% | DPWH |
| 23CC0229 | Construction of Revetment along Hagonoy River at Barangay San Roque, Hagonoy, Bulucan | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 100.00% | DPWH |
| 24CC0344 | Construction of River Protection Structure and Rehabilitation of Waterway along Angat River, K000+551 to K000+701, Barangay Bonga Menor, Bustos, Bulacan | WRO CONST CORP / GRACE CONST CORP | 100.00% | DPWH |
| 24CC0001 | Construction of Riverbank Protection Structure along Balagtas River, Barangay Santol, Balagtas, Bulacan | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 100.00% | DPWH |
| 24CC0343 | Construction of River Protection Structure and Rehabilitation of Waterway along Angat River, K010+793 to K010+943, Barangay Cambaog, Bustos, Bulacan | WBX CONST INC FORMERLY WBX CONST | 100.00% | DPWH |
| 23CC0250 | Construction of Flood Control Structure at Barangay Pagala, Baliuag, Bulacan (K003+120 to K003+420) | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 100.00% | DPWH |
| 23CC0161 | Construction of River Control Project at Barangay Tangos, Sta. 00+300 to Sta. 00+700, Baliuag, Bulacan | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 24CC0053 | Construction of Riverbank Protection Structure at Barangay Pritil, Guiguinto, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0006 | Construction of Flood Mitigation Structures along Barangay Sto. Rosario, Paombong, Bulacan | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 100.00% | DPWH |
| 24CC0383 | Construction of Reinforced Concrete Flood Control Structure along Angat River, Lumang Bayan Section, Plaridel, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0406 | Construction of Slope Protection, Barangay Paltao, Pulilan, Bulacan | TBB CONST CORP | 100.00% | DPWH |
| 23CC0056 | Construction of Slope Protection (Revetment), Barangay Cambaog, Bustos, Bulacan | WBX CONST INC FORMERLY WBX CONST | 100.00% | DPWH |
| 24CC0024 | Construction of Riverbank Protection Structure (Phase III) at Barangay San Roque, Baliuag, Bulacan | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 100.00% | DPWH |
| 23CC0160 | Construction of Flood Control Structure Cambaog-Talampas Tributaries of Angat River, Bustos, Bulacan | 729 CONST INC FORMERLY 722 CONST INC | 100.00% | DPWH |
| 22CC0212 | Rehabilitation of Waterways and Construction of Flood Control Structure along Balagtas River (Longos Section), Balagtas, Bulacan | SAMJS CONST SERVICES | 100.00% | DPWH |
| 24CC0162 | Construction of Reinforced Concrete Flood Control Structure along Balagtas River, Barangay San Juan (Bigaang Matanda), Balagtas, Bulacan | JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 23CC0059 | Construction of Concrete Slope Protection at Barangay Pagala, K002 + 360 - K002 + 660, Baliuag, Bulacan | DMLC BUILDERS | 100.00% | DPWH |
| 24CC0081 | Construction of Riverbank Protection Structure at Barangay Cambaog (Tributary), Bustos, Bulacan | C & F CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 22CC0199 | Rehabilitation of Angat River Control Structure, Sta. 00+000 to Sta. 00+345, Brgy. Tibagan, Bustos, Bulacan | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 23CC0283 | Improvement of Waterways and Flood Control Structures along Balagtas River (Tributary), Brgy. Panginay to Wawa, Balagtas, Bulacan (Phase II) | R2A CONST & TRADING CORP | 100.00% | DPWH |
| 24CC0023 | Construction of Riverbank Protection Structure (Phase II) at Barangay San Roque, Baliuag, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 24CC0050 | Construction of Riverbank Protection Structure at Barangay Bagbaguin, Pandi, Bulacan | M S RAMOS CONST INC FORMERLY: M S RAMOS | 100.00% | DPWH |
| 24CC0172 | Construction of Reinforced Concrete Flood Control Structure at Barangay Catulinan, Baliuag, Bulacan | GLOBALCRETE BUILDERS INC | 100.00% | DPWH |
| 22CC0017 | Construction Of River Protection - Panasahan, Malolos, Bulacan | J SIMEON CONST | 100.00% | DPWH |
| 24CC0047 | Construction of Riverbank Protection Structure at Barangay Bunsuran, Pandi, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0009 | Construction of Flood Control Structure along Barangay Santa Monica, Hagonoy, Bulacan | E M CUERPO INC | 100.00% | DPWH |
| 23CC0226 | Construction of Revetment along Hagonoy River at Barangay Santa Cruz, Hagonoy, Bulacan | M S RAMOS CONST INC FORMERLY: M S RAMOS / 121 CONST CORP FORMERLY 121 CONSTUC | 100.00% | DPWH |
| 24CC0167 | Construction of Reinforced Concrete Flood Control Structure at Barangay San Roque (Purok 1 to Purok 3), Baliuag, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 24CC0057 | Construction of Slope Protection Structure and Waterways, Barangay Malis, Guiguinto, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BEAM TEAM DEVELOPER SPECIALIST INC | 100.00% | DPWH |
| 23CC0098 | Construction of River Control Project along Balagtas River, San Juan Secton, Sta. 09+810 - Sta. 10+015, Balagtas, Bulacan | AZUL BUILDERS / JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 23CC0225 | Construction of Flood Control Structure along Balagtas River, Barangay Santol, Balagtas, Bulacan (K001+870 to K002+068) | STAR WILLIAM CONST | 100.00% | DPWH |
| 22CC0263 | Improvement of Balagtas River Waterways with Flood Control Structure, Sta. 0 + 000 to Sta. 0 + 540, Longos, Balagtas, Bulacan | AZUL BUILDERS / JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 24CC0200 | Construction of Reinforced Concrete Slope Revetment at Barangay Canalate, Malolos City, Bulacan | SYMS CONST TRADING | 100.00% | DPWH |
| 24CC0030 | Construction of Riverbank Protection Structure at Barangay San Roque, Baliuag, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 24CC0420 | Construction of Drainage Canal, Barangay Poblacion, Bustos, Bulacan | PLL BUILDERS INC | 100.00% | DPWH |
| 23CC0215 | Construction of River Protection Structure including Rehabilitation of Waterways at Brgy. Bagbaguin, Pandi, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 24CC0046 | Construction of Riverbank Protection Structure at Barangay Catulinan, Baliuag, Bulacan | JAGONBUILD CONST CORP FOR JAGON BUILDERS | 100.00% | DPWH |
| 24CC0141 | Construction of Flood Mitigation Structure at Calizon, Calumpit, Bulacan | 11-16 CONST | 100.00% | DPWH |
| 23CC0219 | Construction (Improvement) of Slope Protection Structure and Waterways at Barangay Panasahan, Malolos City, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 24CC0082 | Construction of Riverbank Protection Structure along Angat River, Barangay Parulan, Plaridel, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0052 | Construction of Riverbank Protection Structure at Barangay Santa Cruz, Guiguinto, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 24CC0020 | Construction of Riverbank Protection Structure at Barangay San Vicente, Malolos City, Bulacan | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 22CC0142 | Rehabilitation of Flood Control Structure along Angat River, Makinabang Section, Sta. 0 + 000 to Sta. 0 + 353.60, Baliuag, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0039 | Construction of Riverbank Protection Structure at Barangay Malis, Guiguinto, Bulacan | A R L CONST | 100.00% | DPWH |
| 23CC0023 | Construction of Flood Control Structure along Bocaue River, Bambang Section, Bocaue, Bulacan | M G FRANCISCO CONST | 100.00% | DPWH |
| 23CC0053 | Construction of River Control Project along Angat River, Bintog Tributary Section, Plaridel, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0048 | Construction of Riverbank Protection Structure at Barangay Bunsuran (Phase II), Pandi, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0189 | Construction of Reinforced Concrete Flood Control Structure, Barangay Meyto (Purok 4 to Purok 5), Calumpit, Bulacan | IM CONST CORP | 100.00% | DPWH |
| 23CC0308 | Construction of Flood Control System along Angat River Lumang Bayan Section, Plaridel, Bulacan (Sta. 19+300 to Sta. 19+460) | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 24CC0140 | Construction of Flood Mitigation Structure at Frances, Calumpit, Bulacan | 11-16 CONST | 100.00% | DPWH |
| 24CC0037 | Construction of Riverbank Protection Structure along Guiguinto River, Barangay Daungan, Guiguinto, Bulacan | M S RAMOS CONST INC FORMERLY: M S RAMOS | 100.00% | DPWH |
| 23CC0130 | Construction of Riverwall at Barangay Piel, Sta. 01+410 to Sta. 01+810, Baliuag, Bulacan | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 23CC0321 | Construction of River Protection along Angat River, K011 + 810 to K011 + 960, Culianin, Plaridel, Bulacan | CEDAR CONST | 100.00% | DPWH |
| 24CC0403 | Construction/Improvement of Slope Protection Structure and Waterways along Bocaue River, Brgy. Bambang (Sitio Pulo To Purok 6), Bocaue, Bulacan | TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC | 100.00% | DPWH |
| 24CC0327 | Construction of Reinforced Concrete Flood Control Structure, Barangay Bagumbayan, Bulakan, Bulacan | STAR WILLIAM CONST | 100.00% | DPWH |
| 24CC0182 | Construction of Concrete Slope River Wall along Balagtas River, Barangay Panginay (Tributary), Balagtas, Bulacan | JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 23CC0241 | Construction of Flood Mitigation Structures Bulihan- Anilao Creek, Malolos, Bulacan | JTC CRUZ CONST CO INC | 100.00% | DPWH |
| 23CC0256 | Construction of Flood Control Structure at Barangay Hinukay, Baliuag, Bulacan (K004+530 to K004+830) | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 100.00% | DPWH |
| 24CC0025 | Construction of Riverbank Protection Structure (Phase IV) at Barangay San Roque, Baliuag, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 22CC0012 | Construction of River Protection, Sta. Ana, Bulacan, Bulacan | SAMJS CONST SERVICES | 100.00% | DPWH |
| 22CC0019 | Construction of River Protection along Barangay Frances, Calumpit, Bulacan | J SIMEON CONST | 100.00% | DPWH |
| 21CC0291 | Construction/Improvement of Bulihan-Longos Creek, Malolos City | TRICHES CONST & TRADING / FRAMECON BUILDERS | 100.00% | DPWH |
| 24CC0183 | Construction of Flood Control Structure along Balagtas River, Barangay San Juan, Purok 4-Purok 5, Balagtas, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0296 | Construction of Slope Protection Structure and Waterways, Barangay Malibong Bata, Pandi, Bulacan | TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC | 100.00% | DPWH |
| 24CC0164 | Construction of River Control Structure at Barangay Poblacion Purok 1 Guiguinto, Bulacan | ORANI CONST AND SUPPLY CORP FORMERLY:ORANI BUILDERS & SUPPLY | 100.00% | DPWH |
| 22CC0215 | Construction of Riverbank Protection along Bocaue River Brgy. Caingin Bocaue, Bulacan | 729 CONST INC FORMERLY 722 CONST INC | 100.00% | DPWH |
| 23CC0144 | Construction of Riverwall at Barangay Sulivan, Sta. 02+310 to Sta. 02+710, Baliuag, Bulacan | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 24CC0002 | Construction of Riverbank Protection Structure along Balagtas River (Phase II), Barangay Pulong Gubat, Balagtas, Bulacan | A R L CONST | 100.00% | DPWH |
| 23CC0270 | Construction of Flood Control Structure at Barangay Piel, Baliuag, Bulacan (K003+690 to K003+990) | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 23CC0326 | Construction of Flood Control Project and Rehabilitation of Waterways along Angat River Brgy. Culianin, Plaridel, Bulacan | JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 23CC0054 | Construction of River Control Project along Angat River, Banga Section, Sta. 17+650 to Sta. 17+750, Plaridel, Bulacan | 5-1 CONST CORP | 100.00% | DPWH |
| 23CC0214 | Construction of Flood Control Structure along Bagbag Creek, Barangay Malis, Guiguinto, Bulacan (K004+300 to K004+500) | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0269 | Construction of Flood Control System at Barangay Piel, Baliuag, Bulacan (Sta. 03+480 to Sta. 03+740) | MICHARIAN BUILDERS AND TRADING | 100.00% | DPWH |
| 23CC0187 | Construction of Drainage Structure, Pulilan, Bulacan | A L SALAZAR CONST INC | 100.00% | DPWH |
| 23CC0155 | Construction of River Control Project at Barangay Sulivan, Sta. 01+900 to Sta. 02+300, Baliuag, Bulacan | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 24CC0051 | Construction of Flood Control Structure, Barangay Santa Cruz, Guiguinto, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0238 | Construction of Revetment along Hagonoy River at Barangay Sagrada Familia, Hagonoy, Bulacan | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 100.00% | DPWH |
| 24CC0171 | Construction of Reinforced Concrete Flood Control Structure at Barangay Pagala (Purok 3 to Purok 4), Baliuag, Bulacan | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 22CC0138 | Rehabilitation of River Control Structures along Angat River, Tanawan, Bustos, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 23CC0096 | Construction of River Control Project along Guiguinto River, Barangay Daungan, Sta. 02+690 to Sta. 03+050, Guiguinto, Bulacan | A R L CONST | 100.00% | DPWH |
| 24CC0193 | Construction of Reinforced Concrete Flood Control Structure along Labangan Channel and its tributaries, Barangay San Pedro, Hagonoy, Bulacan | TRICHES CONST & TRADING | 100.00% | DPWH |
| 24CC0013 | Construction of Riverbank Protection Structure at Barangay Iba, Hagonoy, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 22CC0143 | Rehabilitation of Flood Control Structure along Angat River, Parulan Section, Sta. 0 + 000 to Sta. 0 + 353.60, Plaridel, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0281 | Construction of Waterways and Construction of Concrete Revetment along Angat River Dampol Section, Plaridel, Bulacan K025+150-K025+350 | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 23CC0387 | Construction of River Protection Structure and Rehabilitation of Waterways along Guiguinto River Brgy. Sta. Cruz Guiguinto, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 24CC0165 | Construction of Reinforced Concrete Flood Control Structure along Balagtas River, Barangay Santol (Purok 1 to Purok 3), Balagtas, Bulacan | JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 23CC0001 | Construction of Flood Control Structure along Barangay Meyto, Calumpit, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0035 | Construction of Riverbank Protection Structure at Barangay Tilapayong, Baliuag, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0036 | Construction of Riverbank Protection Structure at Barangay Pagala, Baliuag, Bulacan | FERDSTAR BUILDERS INC | 100.00% | DPWH |
| 23CC0147 | Construction of River Control Project along Angat River, San Jose Tributary Section, Plaridel, Bulacan | IM CONST CORP | 100.00% | DPWH |
| 24CC0384 | Construction of Reinforced Concrete Flood Control Structure along Angat River, Tanawan Section, Bustos, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 24CC0075 | Construction of Riverbank Protection Structure along Angat River (Phase II), Barangay Tilapayong, Baliuag, Bulacan | BELL CONST | 100.00% | DPWH |
| 24CC0294 | Construction of Reinforced Concrete Flood Control Structure at Barangay Cambaog-Talampas (Purok 3), Bustos, Bulacan | ORANI CONST AND SUPPLY CORP FORMERLY:ORANI BUILDERS & SUPPLY | 100.00% | DPWH |
| 23CC0052 | Construction of Flood Control Structure San Jose-Bintog Tributaries of Angat River, Plaridel, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 24CC0291 | Construction of Revetment at Barangay Sta. Elena, Hagonoy, Bulacan | STAR WILLIAM CONST | 100.00% | DPWH |
| 23CC0279 | Construction of Flood Control Structure at Barangay Sulivan, Baliuag, Bulacan (K003+770 to K004+070) | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 24CC0381 | Construction of Reinforced Concrete Flood Control Structure along Angat River, Cambaog Section, Bustos, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0274 | Construction of Reinforced Concrete Flood Control Structure, Barangay Cambaog (Sitio Teodoro to Purok 4), Bustos, Bulacan | JAGONBUILD CONST CORP FOR JAGON BUILDERS | 100.00% | DPWH |
| 24CC0455 | Construction/Improvement of Slope Protection Structures and Waterways, Barangay San Jose, Calumpit, Bulacan | TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC | 100.00% | DPWH |
| 24CC0370 | Construction of Reinforced Concrete Flood Control Structure along Angat River, San Pedro Section, Bustos, Bulacan | SYMS CONST TRADING | 100.00% | DPWH |
| 23CC0158 | Construction of Flood Mitigation Structure, Palapat, Hagonoy, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 23CC0132 | Construction of River Control Project at Barangay Hinukay, Sta. 01+960 to Sta. 02+360, Baliuag, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 23CC0255 | Construction of Flood Control Structure at Barangay San Roque, Baliuag, Bulacan (K001+300 to K001+600) | WAWAO BUILDERS / DRJY CONST | 100.00% | DPWH |
| 24CC0481 | Construction of AMRIS Calantipay Creek Slope Protection, Baliwag, Bulacan | ANORE CONST | 100.00% | DPWH |
| 24CC0293 | Construction of Reinforced Concrete Flood Control Structure, Barangay Cambaog (Sitio Teodoro), Bustos, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0270 | Construction of Revetment at Barangay Sagrada, Hagonoy, Bulacan | MICHARIAN BUILDERS AND TRADING | 100.00% | DPWH |
| 24CC0188 | Construction of Reinforced Concrete Flood Control Structure, Barangay San Isidro (Purok 4 to Purok 5), Hagonoy, Bulacan | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 100.00% | DPWH |
| 24CC0271 | Construction of Revetment at Barangay Tampok, Hagonoy, Bulacan | SAMJS CONST SERVICES | 100.00% | DPWH |
| 23CC0282 | Construction of Flood Control Structure at Barangay San Roque, Baliuag, Bulacan (K001+600 to K001+900) | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 23CC0247 | Construction of Flood Mitigation Structures along Bgry. Tikay, Malolos, Bulacan | JTC CRUZ CONST CO INC | 100.00% | DPWH |
| 24CC0369 | Construction of Reinforced Concrete Flood Control Structure along Angat River, Barangay San Pedro (Purok 2), Bustos, Bulacan | A R L CONST | 100.00% | DPWH |
| 23CC0106 | Construction of Flood Mitigation Structures along Barangay San Jose, Paombong, Bulacan | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 100.00% | DPWH |
| 23CC0236 | Construction of River Protection Structure along Calero River and Its Tributaries, Barangay Atlag, Malolos City, Bulacan | FERDSTAR BUILDERS INC | 100.00% | DPWH |
| 22CC0190 | Construction of Slope Protection along Balagtas River, Sta. 01 + 947 to Sta. 02 + 237, San Juan Section, Balagtas, Bulacan | DMLC BUILDERS | 100.00% | DPWH |
| 24CC0426 | Construction of Reinforced Concrete Flood Control Structure, Barangay Anilao, Malolos City, Bulacan | MICHARIAN BUILDERS AND TRADING | 100.00% | DPWH |
| 24CC0156 | Construction of Guiguinto Flood Control Structure, Pritil Section, Guiguinto, Bulacan | JOSE RUBI CONST | 100.00% | DPWH |
| 23CC0043 | Construction of Flood Control Structure along Angat River at Poblacion Section, Plaridel, Bulacan | EIGHT KIDS CONST AND TRADING | 100.00% | DPWH |
| 23CC0136 | Construction of Flood Mitigation Structures along Barangay Balubad, Bulacan, Bulacan | FERDSTAR BUILDERS INC | 100.00% | DPWH |
| 23CC0118 | Construction of Revetment at Taal, Pulilan, Bulacan | MICHARIAN BUILDERS AND TRADING | 100.00% | DPWH |
| 24CC0158 | Construction of River Protection Structure, Barangay Sta. Cruz, Guiguinto, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0162 | Construction of Riverwall along Guiguinto River, Tabang (Tributary) Section, Sta. 01+370 to Sta. 01+730, Guiguinto, Bulacan | AZUL BUILDERS / JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 23CC0257 | Construction of Flood Control System at Barangay Hinukay, Baliuag, Bulacan (Sta. 04+320 to Sta. 04+580) | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 100.00% | DPWH |
| 24CC0084 | Construction of Riverbank Protection Structure along Angat River, Barangay San Jose, Plaridel, Bulacan | BELL CONST | 100.00% | DPWH |
| 22CC0148 | Construction of Bulihan-Longos Creek, Malolos City, Bulacan | FRAMECON BUILDERS | 100.00% | DPWH |
| 23CC0038 | Construction of Flood Control Structure along Guiguinto River, Ilang-ilang Section, Ilang-ilang, Guiguinto, Bulacan | ROSSLANCE CONST AND DEVELOPMENT | 100.00% | DPWH |
| 24CC0168 | Construction of Reinforced Concrete Flood Control Structure along Balagtas River, Barangay Panginay (Sitio Sulok), Balagtas, Bulacan | JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 23CC0007 | Construction of Revetment at Atlag, Malolos City, Bulacan | EL KAPITAN CONST SERVICES | 100.00% | DPWH |
| 22CC0058 | Rehabilitation of River Protection Structure along Bulusan, Calumpit, Bulacan | ST TIMOTHY CONST CORP | 100.00% | DPWH |
| 23CC0093 | Construction of Riverwall along Balagtas River, Panginay (RS) , Sta. 16+520 to Sta. 16+725, Balagtas, Bulacan | AZUL BUILDERS / JB CONST AND SUPPLY INC FORMERLY:JB CONST AND SUPPLY | 100.00% | DPWH |
| 23CC0076 | Construction of River Control Project along Guiguinto River, Barangay Pritil, Sta. 02+470 - Sta. 02+830, Guiguinto, Bulacan | ORANI CONST AND SUPPLY CORP FORMERLY:ORANI BUILDERS & SUPPLY | 100.00% | DPWH |
| 24CC0357 | Construction of Revetment at Carillo - Abulalas along Angat River at Hagonoy, Bulacan | SYMS CONST TRADING | 100.00% | DPWH |
| 22CC0277 | Construction of Manila North Road Drainage Tributary Outfall, Longos- Calumpit Section, Malolos City, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0063 | Construction of River Control Project along Angat River, Lumang Bayan Section, Sta. 03+190 to Sta. 03+340, Plaridel, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0057 | Construction of Concrete Slope Protection at Barangay Sulivan, K003 + 350 - K003 + 550, Baliuag, Bulacan | JUSTBILT BUILDERS | 100.00% | DPWH |
| 24CC0213 | Construction of Drainage System along Taal-Caingin Road, Bocaue, Bulacan | 121 CONST CORP FORMERLY 121 CONSTUC | 100.00% | DPWH |
| 23CC0223 | Construction of Flood Control Structure along Balagtas River, Barangay Santol, Balagtas, Bulacan (K003+835 to K004+033) | STAR WILLIAM CONST | 100.00% | DPWH |
| 23CC0185 | Construction of Flood Mitigation Structure, Brgy. Abulalas, Hagonoy, Bulacan | MICHARIAN BUILDERS AND TRADING | 100.00% | DPWH |
| 24CC0076 | Construction of Riverbank Protection Structure along Angat River, Barangay Banga I, Plaridel, Bulacan | TBB CONST CORP | 100.00% | DPWH |
| 23CC0077 | Construction of Concrete Slope Protection along Balagtas River Panginay (RS), K018 + 200 - K018 + 405, Balagtas, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0278 | Construction of Flood Control Structure at Barangay Sulivan, Baliuag, Bulacan (K003+821 to K004+121) | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 23CC0149 | Construction of River Control Project along Guiguinto River, Tabang Tributary Section, Sta. 01+000 to Sta. 01+360, Guiguinto, Bulacan | A R L CONST | 100.00% | DPWH |
| 24CC0367 | Construction of Revetment at Sta. Elena - San Pedro along Angat River at Hagonoy, Bulacan | SYMS CONST TRADING | 100.00% | DPWH |
| 21CC0257 | Rehabilitation/ Improvement with Revetment along Malolos River, Catmon to Caingin, Malolos, Bulacan | PRECIOUS CONST | 100.00% | DPWH |
| 22CC0018 | Construction of Flood Mitigation Structure at Barangay Masile, City of Malolos, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0268 | Construction of Flood Control System at Barangay Sulivan, Baliuag, Bulacan (Sta. 03+560 to Sta. 03+820) | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 100.00% | DPWH |
| 23CC0060 | Construction of Concrete Slope Protection at Barangay Tangos, K002 + 360 - K002 + 960, Baliuag, Bulacan | DMLC BUILDERS | 100.00% | DPWH |
| 24CC0269 | Improvement/Rehabilitation of Waterways, Brgy. Panasahan, Malolos City, Bulacan | DMLC BUILDERS | 100.00% | DPWH |
| 23CC0134 | Construction of Riverwall at Barangay Hinukay, Sta. 02+370 to Sta. 02+770, Baliuag, Bulacan | M3 KONSTRACT CORP FORMERLY:MARGARITA CONST | 100.00% | DPWH |
| 23CC0227 | Construction of Revetment along Labangan Channel at Sitio Buga, Barangay Santa Elena, Hagonoy, Bulacan | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 100.00% | DPWH |
| 23CC0243 | Construction of Flood Mitigation Structures along Bgry. Masile, Malolos, Bulacan | JTC CRUZ CONST CO INC | 100.00% | DPWH |
| 23CC0213 | Construction of Flood Control Structure along Angat River, Sta. Barbara, Baliuag, Bulacan (K010+080 to K010+380) | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 23CC0242 | Construction of River Protection Structure along Calero River and Its Tributaries, Barangay Masile, Malolos City, Bulacan | FERDSTAR BUILDERS INC | 100.00% | DPWH |
| 22CC0146 | Construction of Flood Control Structure along Angat River at Tanawan, Bustos, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 23CC0296 | Construction of Flood Control Structure along Angat River, Barangay Sabang Baliuag, Bulacan (K000+871 to K001+171) | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 23CC0064 | Construction of Flood Control Structure along Angat River at Banga 2nd Section, Plaridel, Bulacan | NICLEDON CONST | 100.00% | DPWH |
| 23CC0186 | Construction of Flood Mitigation Structure, Brgy. San Jose, Calumpit, Bulacan | SYMS CONST TRADING | 100.00% | DPWH |
| 24CC0016 | Construction of Riverbank Protection Structure at Barangay Meysulao, Calumpit, Bulacan | DARCY & ANNA BUILDERS & TRADING | 100.00% | DPWH |
| 22CC0011 | Construction of River Protection at Barangay Sta. Ana, Phase 2, Bulakan, Bulacan | A R L CONST | 100.00% | DPWH |
| 23CC0209 | Construction of River Protection along Balagtas River, K013 + 060 to K013 + 164, San Juan Section, Balagtas, Bulacan | 11-16 CONST | 100.00% | DPWH |
| 24CC0034 | Construction of Riverbank Protection Structure at Barangay Calero, Malolos City, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0203 | Construction of River Protection Structures and Improvement of Waterways Caliligawan, Malolos City, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 23CC0222 | Construction of Flood Control Structure along Balagtas River, Barangay Dalig, Balagtas, Bulacan (K006+950 to K007+148) | STAR WILLIAM CONST | 100.00% | DPWH |
| 22CC0176 | Construction of River Protection along Brgy. Sta. Ines, Bulakan, Bulacan | A R L CONST | 100.00% | DPWH |
| 23CC0089 | Construction of River Control Project along Balagtas River, Santol, Sta. 01+500 - Sta. 01+850, Balagtas, Bulacan | A R L CONST | 100.00% | DPWH |
| 24CC0014 | Construction of Riverbank Protection Structure at Barangay Iba-Ibayo, Hagonoy, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0101 | Construction of Flood Mitigation Structures along Barangay San Roque, Paombong, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 23CC0254 | Construction of Flood Control Structure at Barangay San Roque, Baliuag, Bulacan (K001+062 to K001+362) | WAWAO BUILDERS | 100.00% | DPWH |
| 24CC0018 | Construction of Riverbank Protection Structure at Barangay San Miguel, Calumpit, Bulacan | WAWAO BUILDERS | 100.00% | DPWH |
| 22CC0016 | Construction of Flood Mitigation Structure at Barangay Panducot, Calumpit, Bulacan | MCB ZAMORA CONST & SUPPLY | 100.00% | DPWH |
| 24CC0186 | Construction/Improvement of Flood Mitigation Structure at Sapang Bayan, Calumpit, Bulacan | FERDSTAR BUILDERS INC | 100.00% | DPWH |
| 22CC0264 | Rehabilitation of Balagtas River Control Structure, Sta. 00+000 to Sta. 00+392, Brgy. Pulong Gubat, Balagtas, Bulacan | 729 CONST INC FORMERLY 722 CONST INC | 100.00% | DPWH |
| 23CC0104 | Rehabilitation of Waterways and Construction of Water Pumping Station at Barangay Poblacion, Guiguinto, Bulacan | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 24CC0295 | Bank Improvement and Rehabilitation of Waterways, Brgy. Mambog, Malolos City, Bulacan | DMLC BUILDERS | 100.00% | DPWH |
| 22CC0039 | Construction of River Protection, Balubad, Bulacan, Bulacan | J SIMEON CONST | 100.00% | DPWH |
| 24CC0161 | Construction of Reinforced Concrete Flood Control Structure along Bocaue River, Barangay Turo, Bocaue, Bulacan | A R L CONST | 100.00% | DPWH |
| 24CC0401 | Construction/Improvement of Slope Protection Structure and Waterways along Bocaue River, Brgy. Turo (Sitio Hangga), Bocaue, Bulacan | TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC | 100.00% | DPWH |
| 22CC0147 | Rehabilitation of Flood Control Structures along Guiguinto River, Malis Section, Guiguinto, Bulacan | TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 100.00% | DPWH |
| 22CC0232 | Construction of Flood Control Structure along Balagtas River (Phase 2), Barangay Malibong, Pandi, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 100.00% | DPWH |
| 24CC0342 | Construction of Reinforced Concrete Flood Control Structure, Barangay Tibaguin, Hagonoy, Bulacan | FRAMECON BUILDERS | 100.00% | DPWH |
| 24CC0463 | Construction of Drainage Canal, Barangay Parulan, Plaridel, Bulacan | RVR3 CONST SUPPLY AND SERVICES | 100.00% | DPWH |
| 23CC0044 | Construction of River Control Project along Angat River, San Jose Section, Sta. 07+950 to Sta. 08+080, Baliuag, Bulacan | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 100.00% | DPWH |
| 22CC0106 | Construction of Flood Control Structure along Balagtas River, Barangay Malibong, Pandi, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 99.99% | DPWH |
| 24CC0194 | Construction of Reinforced Concrete Flood Control Structure, Barangay San Juan (Purok 4 to Purok 5), Hagonoy, Bulacan | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 99.99% | DPWH |
| 23CC0244 | Construction of Flood Mitigation Structures along Bgry. Caliligawan, Malolos, Bulacan | DMLC BUILDERS | 99.99% | DPWH |
| 24CC0179 | Construction/lmprovement of Flood Mitigation Structure at Mercado, Hagonoy, Bulacan | 11-16 CONST | 99.99% | DPWH |
| 22CC0207 | Rehabilitation of Flood Control Structure along Balagtas River (Longos Section), Balagtas, Bulacan | TBB CONST CORP | 99.99% | DPWH |
| 23CC0139 | Construction of Revetment along Balagtas River, Malibong Bata Section, Malibong Bata, Pandi, Bulacan | JAGONBUILD CONST CORP FOR JAGON BUILDERS | 99.99% | DPWH |
| 24CC0019 | Construction of Riverbank Protection Structure at Barangay San Miguel, Hagonoy, Bulacan | JUSTBILT BUILDERS | 99.99% | DPWH |
| 22CC0206 | Construction of Flood Control Structures along Balagtas River Sta. 00+760 to Sta. 00+960 Brgy. Dalig, Balagtas, Bulacan | WBX CONST INC FORMERLY WBX CONST | 99.99% | DPWH |
| 23CC0107 | Construction of Flood Mitigation Structures along Barangay Pinalagdan, Paombong, Bulacan | WAWAO BUILDERS | 99.99% | DPWH |
| 23CC0266 | Construction of Drainage Canal, Brgy. Dampol I, Pulilan, Bulacan | BIG BEN CONST | 99.99% | DPWH |
| 23CC0024 | Construction of Flood Control Structures along Bocaue River, Poblacion, Bocaue, Bulacan | TIONGCO MENDOZA CONST CO INC | 99.99% | DPWH |
| 23CC0176 | Construction of Flood Control Structures and Improvement of Waterways along Barangay Panducot, Calumpit, Bulacan | JAGONBUILD CONST CORP FOR JAGON BUILDERS | 99.99% | DPWH |
| 23CC0399 | Rehabilitation of Drainage including Road Barangay Antipona, Bocaue, Bulacan | AVE-MIRA CONST AND TRADING | 99.99% | DPWH |
| 22CC0216 | Construction of Flood Control Structures along Bocaue River Sta. 00+398 to Sta. 00+598 Brgy. Taal, Bocaue, Bulacan | TOPNOTCH CATALYST BUILDERS INC | 99.99% | DPWH |
| 24CC0191 | Construction of Reinforced Concrete Flood Control Structure, Barangay San Miguel (Purok 7 to Purok 8), Hagonoy, Bulacan | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 99.99% | DPWH |
| 24CC0208 | Construction of Drainage System, Barangay Wakas, Bocaue, Bulacan | 121 CONST CORP FORMERLY 121 CONSTUC | 99.99% | DPWH |
| 23CC0036 | Construction of Drainage Canal, Liciada, Bustos, Bulacan | TIONGCO MENDOZA CONST CO INC | 99.99% | DPWH |
| 23CC0140 | Construction of Revetment at Pamarawan, Malolos City, Bulacan | EL KAPITAN CONST SERVICES | 99.99% | DPWH |
| 22CC0191 | Construction of Flood Control Structures along Guiguinto River Sta. 01+840 to Sta. 02+040 Malis Section, Guiguinto, Bulacan | NICLEDON CONST | 99.99% | DPWH |
| 24CC0394 | Construction of Reinforced Concrete Flood Control Structure, Barangay Caliligawan, Malolos City, Bulacan | SYMS CONST TRADING | 99.99% | DPWH |
| 23CC0141 | Construction of Revetment at Matungao, Bulakan, Bulacan | STAR WILLIAM CONST | 99.99% | DPWH |
| 24CC0071 | Construction of Revetment at Barangay Palimbang-San Marcos-Balite-Sergio Bayan, Calumpit, Bulacan | PTM DEVELOPMENT CORP | 99.99% | DPWH |
| 23CC0122 | Construction of River Control Project along Angat River, Tibagan Section, Sta. 00+615 - Sta. 00+845, Bustos, Bulacan | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 99.99% | DPWH |
| 22CC0136 | Improvement of Major River System and Construction of Spur Dike along Angat River, Sta. 0 + 532 - Sta. 0 + 867, Bintog Section, Plaridel, Bulacan | WAWAO BUILDERS | 99.99% | DPWH |
| 23CC0267 | Construction of Flood Control System at Barangay Pagala, Baliuag, Bulacan (Sta. 02+900 to Sta. 03+160) | DARCY & ANNA BUILDERS & TRADING | 99.99% | DPWH |
| 22CC0137 | Construction of Flood Control Structure along Angat River (Sta. 0 + 672 - Sta. 1 + 007), San Pedro and Poblacion Section, Bustos and Baliuag, Bulacan | TBB CONST CORP | 99.99% | DPWH |
| 24CC0273 | Construction/improvement of Flood Mitigation Structure at Matungao,Bulakan, Bulacan | 11-16 CONST | 99.99% | DPWH |
| 24CC0032 | Construction of Riverbank Protection Structure at Barangay Bulihan, Malolos City, Bulacan | WAWAO BUILDERS | 99.98% | DPWH |
| 23CC0138 | Construction of Flood Mitigation Structures along Barangay San Francisco, Bulacan, Bulacan | 11-16 CONST | 99.98% | DPWH |
| 23CC0202 | Construction of Revetment (Concrete Slope) at Sitio Pulo, San Roque, Paombong, Bulacan | SYMS CONST TRADING | 99.98% | DPWH |
| 24CC0190 | Construction of Reinforced Concrete Flood Control Structure, Barangay Frances (Purok 4 to Purok 5), Calumpit, Bulacan | JAGONBUILD CONST CORP FOR JAGON BUILDERS | 99.98% | DPWH |
| 23CC0220 | Construction of Flood Mitigation Structures along Bgry. Panasahan, Malolos, Bulacan | JTC CRUZ CONST CO INC | 99.98% | DPWH |
| 23CC0021 | Construction of Flood Control Structure at Barangay Buguion - Sergio Bayan - Balite - San Marcos - Palimbang, Calumpit, Bulacan | ST TIMOTHY CONST CORP | 99.98% | DPWH |
| 22CC0010 | Construction of Flood Control Structure along Purok 4, Burgos St., Barangay Poblacion, Calumpit, Bulacan | SAMJS CONST SERVICES | 99.98% | DPWH |
| 22CC0092 | Construction of Flood Control Structure, Malibong Bata Section, Pandi, Bulacan | M S RAMOS CONST INC FORMERLY: M S RAMOS | 99.98% | DPWH |
| 24CC0178 | Construction/improvement of Flood Mitigation Structure at Panducot, Calumpit, Bulacan | FERDSTAR BUILDERS INC | 99.98% | DPWH |
| 23CC0046 | Construction of Drainage Canal, Bonga Menor, Bustos, Bulacan | PLL BUILDERS INC | 99.97% | DPWH |
| 24CC0197 | Construction/mprovement of Flood Mitigation Structure at Mambog, Malolos City, Bulacan | 11-16 CONST | 99.97% | DPWH |
| 23CC0231 | Construction of Revetment along Labangan Channel and its Tributaries at Barangay Santa Elena, Hagonoy, Bulacan | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 99.97% | DPWH |
| 22CC0299 | Construction of Riverbank Protection along Balagtas River Brgy. Wawa, Balagtas, Bulacan | 729 CONST INC FORMERLY 722 CONST INC | 99.97% | DPWH |
| 22CC0004 | Construction of River Protection along Barangay Pungo, Calumpit, Bulacan | A R L CONST | 99.96% | DPWH |
| 22CC0094 | Construction of Flood Control Structure along San Miguel, Barangay San Miguel, Calumpit, Bulacan | J SIMEON CONST | 99.95% | DPWH |
| 23CC0135 | Construction of River Control Project along Balagtas River, Pandi Section, Sta. 01+690 to Sta. 02+040, Pandi, Bulacan | WAWAO BUILDERS | 99.95% | DPWH |
| 23CC0248 | Construction of Flood Mitigation Structures along Bgry. Pamarawan, Malolos, Bulacan | JTC CRUZ CONST CO INC | 99.93% | DPWH |
| 24CC0196 | Construction of Reinforced Concrete Flood Control Structure, Barangay San Jose (Sitio Nagdasig), Calumpit, Bulacan | TRIPLE 8 CONST & SUPPLY INC FORMERLY TRIPLE 8 CONST & SUPPLY | 99.93% | DPWH |
| 23CC0111 | Construction of Flood Mitigation Structures along Barangay Sta. Monica, Hagonoy, Bulacan | WAWAO BUILDERS | 99.92% | DPWH |
| 23CC0306 | Construction of Drainage Canal Barangay Poblacion, Bocaue, Bulacan | LARSEN-DUTCHER CONSTRACTOR CORP FORMERLY:LARSEN-DUTCHER CONSTRACTOR | 99.91% | DPWH |
| 23CC0074 | Construction of River Control Project along Guiguinto River, Barangay Ilang-Ilang, Guiguinto, Bulacan | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 99.90% | DPWH |
| 23CC0245 | Construction of Flood Mitigation Structures along Bgry. San Vicente, Malolos, Bulacan | JTC CRUZ CONST CO INC | 99.89% | DPWH |
| 23CC0128 | Construction of River Control Project along Balagtas River, Barangay Malibong Bata, Sta. 02+250 to Sta. 02+600, Pandi, Bulacan | WAWAO BUILDERS | 99.81% | DPWH |
| 24CC0425 | Construction of Reinforced Concrete Flood Control Structure, Barangay San Francisco, Bulakan, Bulacan | IM CONST CORP | 99.76% | DPWH |
| 24CC0066 | Construction of Flood Control Structure along Bagbag Creek, Barangay Pritil, Guiguinto, Bulacan | TBB CONST CORP | 99.70% | DPWH |
| 23CC0191 | Construction of Flood Control Facility, Brgy. Sta. Elena, Hagonoy, Bulacan | FLORDES CONST & TRADING CORP FORMERLY FLO | 99.62% | DPWH |
| 23CC0252 | Construction of Flood Control Structure at Barangay Pagala, Baliuag, Bulacan (K003+161 to K003+461) | L R TIQUI BUILDERS INC | 99.36% | DPWH |
| 21C00079 | Improvement of River along Balagtas River, Pandi Section, Pandi, Bulacan | PERRC INC FORMERLY: P E R R C CONST & DEVELOPMENT CORP | 98.34% | DPWH |
| 22CC0222 | Construction of Drainage, Barangay Batia, Bocaue, Bulacan | 121 CONST CORP FORMERLY 121 CONSTUC | 98.00% | DPWH |
| 22CC0074 | Rehabilitation of Drainage Canal, Barangay Bagumbayan, Bocaue, Bulacan | TBB CONST CORP | 98.00% | DPWH |
| 23CC0072 | Construction of Drainage Canal, Pagala, Baliuag, Bulacan | TBB CONST CORP | 97.71% | DPWH |
| 22CC0249 | Bank Improvement along Angat River, Sta. 0 + 290 to Sta. 0 + 530, Sabang Section, Baliuag, Bulacan | DMLC BUILDERS | 96.63% | DPWH |
| 23CC0275 | Construction of Flood Control Structure along Angat River, Barangay Poblacion Plaridel, Bulacan (K019+957 to K020+257) | L R TIQUI BUILDERS INC | 96.50% | DPWH |
| 24CC0358 | Construction of Revetment at Barangay San Jose, Paombong, Bulacan | TOUGHBILT CONST & TRADING INC | 96.02% | DPWH |
| 22CC0268 | Construction of Flood Control Structures along Angat River Sta. 00+760 to Sta. 00+960 Sipat Section, Plaridel, Bulacan | TBB CONST CORP | 96.00% | DPWH |
| 23CC0210 | Construction of River Protection along Guiguinto River, K005 + 750 to K005 + 950, barangay Ilang-ilang, Guiguinto, Bulacan | 11-16 CONST | 96.00% | DPWH |
| 22CC0037 | Construction of Flood Control Structures along Balagtas River, Sta. 0 + 475 - Sta. 0 + 829, Barangay Panginay, Balagtas, Bulacan | M C J VALENZUELA CONST ENT | 96.00% | DPWH |
| 22CC0235 | Construction of Slope Protection along Angat River, Culianin Section, Sta. 00 + 000 - Sta. 00 + 632 | A R L CONST | 96.00% | DPWH |
| 22CC0316 | Construction of Flood Control Structure including Outfall along Brgy. Virgen Delos Flores, Sta. Barbara & Tiaong, Baliuag, Bulacan | WAWAO BUILDERS / SYMS CONST TRADING | 96.00% | DPWH |
| 23CC0295 | Construction of Flood Control Structure and Rehabilitation of Waterways Along Guiginto River Brgy. Poblacion, Guiginto, Bulacan (PHASE II) | TOPNOTCH CATALYST BUILDERS INC | 95.99% | DPWH |
| 23CC0382 | Construction of Flood Mitigation Structure at barangay San Jose (Phase II), Calumpit, Bulacan | C E M CONST INC | 95.97% | DPWH |
| 23CC0020 | Construction of Flood Mitigation Structures along Barangay Binakod, Paombong, Bulacan | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 95.93% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Bulacan 1st District Engineering Office",
"nearAbc": 436,
"trigger": "office_pattern_aggregate",
"officeId": "4968f878-0514-5b2c-8a96-7628699c674f",
"threshold": 0.995,
"binomialTailP": 1.4743874128413244e-46,
"nearAbcRatePct": 96.5,
"totalContracts": 452,
"baselineRatePct": 70.4,
"excessPctPoints": 26.1,
"expectedNearAbc": 318.2,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}Source documents
Cite this record
Love the Philippines. “Awards Very Close to the Budget Ceiling (C2).” Source: sumbong. Data as of October 22, 2026. https://lovethephilippines.com/risk/f62101f2-5c56-47c7-9604-2b1770ee8513
The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.