Construction of Reinforced Concrete Flood Control Structure along Angat River, Tanawan Section, Bustos, Bulacan
Construction of Reinforced Concrete Flood Control Structure along Angat River, Tanawan Section, Bustos, Bulacan is a DPWH-tracked public work in BUSTOS (BULACAN), BULACAN, Region III. Reported contract value: ₱77,199,138.89. Status: Reported complete (DPWH). Contractor on record: WAWAO BUILDERS. Figures trace to sumbong.
Total Contract Cost




