Construction of Flood Mitigation Structure22CC0206

Construction of Flood Control Structures along Balagtas River Sta. 00+760 to Sta. 00+960 Brgy. Dalig, Balagtas, Bulacan

Construction of Flood Control Structures along Balagtas River Sta. 00+760 to Sta. 00+960 Brgy. Dalig, Balagtas, Bulacan is a DPWH-tracked public work in BALAGTAS (BIGAA) (BULACAN), BULACAN, Region III. Reported contract value: ₱24,498,166.71. Status: Reported complete (DPWH). Contractor on record: WBX CONST INC FORMERLY WBX CONST. Figures trace to sumbong.

BALAGTAS (BIGAA) (BULACAN), BULACAN, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱25,000

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-22-0002958 · ₱2,583,500,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22CC0206 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-11-30 → 2025-04-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱122,491 per linear m= 0.6x the Region III median (n=202)

Contract cost ₱24,498,167 ÷ 200 linear m read from the DPWH title (“Sta. 00+760 to Sta. 00+960”; station range length (Sta. a+b to c+d)). National percentile: 51. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Bulacan

Based on the coordinates published with the DPWH record and NOAH file Bulacan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Control Structures along Balagtas River Sta. 00+760 to Sta. 00+960 Brgy. Dalig, Balagtas, Bulacan

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures along Balagtas River Sta. 00+760 to Sta. 00+960 Brgy. Dalig, Balagtas, Bulacan
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002958

₱2,583,500,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002898

₱71,500,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0000929

₱84,820.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱24,498,166.71

Progress

Reported complete (DPWH)

Start Date

April 4, 2022

Target End

November 29, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.