Construction of Flood Control Structure along Bagbag Creek, Barangay Pritil, Guiguinto, Bulacan (K003+220 to K003+420)
Construction of Flood Control Structure along Bagbag Creek, Barangay Pritil, Guiguinto, Bulacan (K003+220 to K003+420) is a DPWH-tracked public work in GUIGUINTO (BULACAN), BULACAN, Region III. Reported contract value: ₱72,374,703.78. Status: Reported complete (DPWH). Contractor on record: M S RAMOS CONST INC FORMERLY: M S RAMOS. Figures trace to sumbong.
Total Contract Cost




