M S RAMOS CONST INC FORMERLY: M S RAMOS is listed as a company organization in Philippine public procurement records on this site, with 163 linked DPWH project(s) totaling about ₱5,113,027,093.37. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
M S RAMOS CONST INC FORMERLY: M S RAMOS
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 163
- Total value
- ₱5,113,027,093.37
- Published flags
- 1
- Region
- Bulacan 2nd DEO · Region III
Online presence
Google Maps: M.S. Ramos Construction Inc.Google Maps, 2026-10-22
RX23+J2G, Santa Maria, Bulacan
Public Record Grade
A transparent, data-derived summary of reported public records for M S RAMOS CONST INC FORMERLY: M S RAMOS — not an accusation or finding of wrongdoing.
Score: 86.40 / 100 · Projects in sample: 163 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 74.4/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 74.4
- lateCompletedProjects
- 7
- onTimeCompletedProjects
- 129
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 157
- pastTargetOngoingProjects
- 21
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 98.2/100 · Weight: 21%
- totalProjects
- 163
- componentScore
- 98.2
- terminatedProjects
- 1
- terminationRatePct
- 0.6
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 162
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.8/100 · Weight: 11%
- projects
- 163
- componentScore
- 99.8
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 163
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 141 geotagged projects (largest by contract value) — Open full map
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE III, SITIO TALAMSI I-SITIO KA25CP0076 · ₱142,535,729.23 · mapped
- Construction of Revetment Wall at Barangay Tangos, Sta. 01+120 to Sta. 01+520, Baliuag, Bulacan23CC0151 · ₱96,499,915.59 · mapped
- Construction of Revetment Wall at Barangay Hinukay, Sta. 02+780 to Sta. 03+180, Baliuag, Bulacan23CC0133 · ₱96,499,701.59 · mapped
- Construction of Revetment Wall at Barangay Piel, Sta. 01+820 to Sta. 02+220, Baliuag, Bulacan23CC0131 · ₱96,499,443.56 · mapped
- Construction of Riverbank Protection Structure at Barangay Bagbaguin, Pandi, Bulacan24CC0050 · ₱96,499,404.34 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH WATER PUMPING AT BARANGAY BAMBANG, BOCAUE, BULACAN24CC0549 · ₱96,499,383.99 · mapped
- Construction of Riverbank Protection Structure along Guiguinto River, Barangay Daungan, Guiguinto, Bulacan24CC0037 · ₱96,499,234.24 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY MANASA, ALIMODIAN, ILOILO (SITE 3)25GI0069 · ₱96,000,500.00 · mapped
- CONSTRUCTION OF NEW PANDI MUNICIPAL HALL, BARANGAY POBLACION, PANDI, BULACAN24CC0560 · ₱95,048,469.89 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD ALONG TAAL LAKE25DC0204 · ₱94,060,583.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD ALONG TAAL LAKE25DC0188 · ₱94,057,204.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD ALONG TAAL LAKE25DC0205 · ₱94,015,510.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION AND FLOOD GATE AT BARANGAY CALERO CREEK, MALOLOS CITY, BULACAN24CC0547 · ₱92,553,253.98 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION AND FLOOD GATE AT BARANGAY SANTO ROSARIO, MALOLOS CITY, BULACAN24CC0548 · ₱92,550,940.47 · mapped
- CONSTRUCTION OF PUMPING STATION AND FLOOD GATE AT CALERO CREEK, PHASE II, MALOLOS CITY, BULACAN25CC0330 · ₱92,459,769.17 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, GENERAL NAKAR, QUEZON, (PACKAGE O)24D00176 · ₱84,148,865.78 · mapped
- CONVERGENCE & SPL. SUPPORT PROG.-BASIC INFRA PROG.-MULTI-PURPOSE BLDGS./FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONST. OF MPB AT BRGY. ABANGAN SUR, MARILAO 2. CONST. OF MPB LIWASANG PANGKALIKASAN NG MARILAO, BRGY. PRENZA I, 3. CONST. OF MPB, BRGY. STA.23C00206 · ₱84,148,309.35 · mapped
- CONVERGENCE & SPL. SUPPORT PROG.-BASIC INFRA. PROG.-MULTI-PURPOSE BLDGS./FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONST. OF MULTI-PURPOSE FACILITY (STA. MARIA STADIUM), BRGY. POBLACION 2. CONST. OF MULTI-PURPOSE BLDG. AT MUN. HALL GROUNDS, BRGY. POBLACIO23C00212 · ₱77,552,743.48 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY MALIS (PUROK 3), GUIGUINTO, BULACAN25CC0181 · ₱77,198,383.33 · mapped
- Construction of Flood Control Project and Rehabilitation of Waterways along Bocaue River Brgy. Bambang Bocaue, Bulacan23CC0316 · ₱74,249,977.42 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE A) AT BARANGAY MALIS (PUROK 3), GUIGUINTO, BULACAN25CC0191 · ₱74,110,815.98 · mapped
- CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER PANGINAY (LS) BALAGTAS, BULACAN STA. 014+980 TO STA. 015+13023CC0544 · ₱72,374,823.08 · mapped
- Construction of Flood Control Structure along Bagbag Creek, Barangay Pritil, Guiguinto, Bulacan (K003+220 to K003+420)23CC0216 · ₱72,374,703.78 · mapped
- Construction of Flood Control Structure along Balagtas River, Panginay (LS), Balagtas, Bulacan (K014+770 to K014+920)23CC0224 · ₱72,374,635.68 · mapped
- CONSTRUCTION OF BALAGTAS RIVER FLOOD MITIGATION STRUCTURE (STA. 03+533 TO STA. 03+683) AT BRGY. SANTOL, BALAGTAS, BULACAN23CC0488 · ₱72,373,266.59 · mapped
- REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BRGYS. PANGINAY TO WAWA (PHASE III), BALAGTAS, BULACAN23CC0483 · ₱72,355,634.06 · mapped
- CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER PANGINAY (TRIBUTARY SECTION) (LS) BALAGTAS, BULACAN STA. 013+200 TO STA. 013+35023CC0537 · ₱69,487,145.24 · mapped
- CONSTRUCTION OF PANDI BYPASS ROAD, PANDI, BULACAN (PHASE V)24CC0538 · ₱65,279,674.33
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - JCT BANCAL-LEON-ANTIQUE BDRY RD- K0048 + 495 - K0048 + 56023GI0027 · ₱62,680,122.03 · mapped
- CONVERGENCE & SPL. SUPPORT PROG.-BIF-MULTI-PURPOSE BLDGS./FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONST. OF MPB, BRGY. BANCAL, MEYCAUAYAN CITY, BULACAN, 2. CONST. OF MPB, PANDAYAN ELEM. SCHOOL, BRGY. PANDAYAN, CITY OF MEYCAUAYAN, BULACAN, PROV. OF BUL.23C00207 · ₱59,400,000.00 · mapped
- CONVERGENCE & SPL. SUPPORT PROG.-BASIC INFRA. PROG. 1.MPB BRGY. BAGONG BUHAY 1, 2. MPB BRGY. GUMAOC EAST. 3. MPB CITY COLLEGE BRGY. MINUYAN I, 4. MPB BRGY. MUZON, 5. MPB BRGY. SAN MARTIN, 6. MPB BRGY. CITRUS, 7. MPB BRGY. MINUYAN 1, SJDM, PROV. OF BULACAN23C00120 · ₱59,377,387.38 · mapped
- CONVERGENCE & SPL. SUPPORT PROG.-BASIC INFRA PROG.-MULTI-PURPOSE BLDGS./FACILITIES TO SUPP. SOCIAL SERVICES: 1.CONST. OF MPB BRGY. IBAYO, 2. CONST. OF MPB BRGY. PRENZA 1, 3. CONST. OF MPB, BRGY. LIAS, MARILAO, BULACAN, PROV. OF BULACAN24C00592 · ₱54,449,876.54 · mapped
- CONVERGENCE & SPL. SUPPORT PROG.-BIP-ACCESS RDS. &/OR BRS. FR. THE NAT'L. RD./S LEAD. TO MAJ./STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF RD. BRGY. PULONG AT BRGR. YANTOC, ANGAT, CONST. OF RD. W/DRAINAGE CANAL BRGY. STA. CRUZ II, SJDM, CONST. OF RDS. BRGY.23C00213 · ₱54,395,842.07 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT SAN AGUSTIN DAGAT-DAGATAN CREEK, STA. 000+000 STA. 000+350, SAN AGUSTIN, SAN RAFAEL, BULACAN21CD0124 · ₱51,536,619.89 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILINDGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONST. OF MULTI-PURPOSE FACILITY (OBANDO STADIUM), BRGY. TAWIRAN, OBANDO, BULACAN, PROV. OF BULACAN23C00141 · ₱49,499,972.67 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, STA. 00+325 - STA. 00+710 (LEFT SIDE), DAUNGAN, GUIGUINTO, BULACAN21CC0199 · ₱49,499,934.43 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, STA. 00+569 - STA. 00+940, MALIS, GUIGUINTO, BULACAN21CC0172 · ₱49,499,912.42 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE FACILITY (OBANDO STADIUM), BRGY. TAWIRAN, OBANDO, BULACAN (PHASE 2), PROV. OF BULACAN25C00578 · ₱49,024,717.31
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE BUILDING, SAN VICENTE, SANTA MARIA, BULACAN, PROVINCE OF BULACAN25C00514 · ₱49,019,115.04 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MUZON RIVERWALL (PHASE 4), BRGY. MUZON, MALABON CITY24OA0037 · ₱49,000,000.00 · mapped
- Construction of Flood Mitigation Structure, Muzon Riverwall (Phase 3), Barangay Muzon, Malabon City24OA0036 · ₱49,000,000.00 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS C-3 ROAD (RIGHT) (S02120LZ), NAVOTAS CITY24OA0053 · ₱48,999,810.96 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS C-3 ROAD (LEFT) (S02121LZ), NAVOTAS CITY24OA0052 · ₱48,998,444.06 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE RIVER, BAMBANG SECTION, STA. 03+278 - STA. 03+589, BOCAUE, BULACAN21CC0192 · ₱48,996,040.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEAD. TO MAJ./STRATEGIC PULIC BLDGS./FACILITIES, CONST. OF ROAD, FLAMENCO ST., BRGY. PANGHULO, OBANDO24C00304 · ₱47,526,370.07 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH PUMPING STATION AT CALERO CREEK, MALOLOS CITY, BULACAN (PHASE III)25CC0447 · ₱47,491,338.11 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MARILAO RIVER AND ITS TRIBUTARIES PHASE II, MARILAO, BULACAN19CD0097 · ₱46,549,787.41 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE RIVER, BARANGAY BAMBANG (SITIO ATUBANG), BOCAUE, BULACAN24CC0638 · ₱46,319,786.32 · mapped
- CONVERGENCE & SPL. SUPPORT PROG.-BASIC INFRASTRUCTURE PROG.-MULTI-PURPOSE BLDGS./FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE BLDG. 1.)BRGY. HEALTH CENTER, MARILAO 2.)BRGY. NAGBALON, MARILAO 3.) BRGY. PATUBIG, MARILAO, BULACAN, PROV. OF B25C00495 · ₱43,922,624.98 · mapped
- Construction of Flood Control Structure, Malibong Bata Section, Pandi, Bulacan22CC0092 · ₱43,201,412.48 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
