Construction of Revetment23CC0131

Construction of Revetment Wall at Barangay Piel, Sta. 01+820 to Sta. 02+220, Baliuag, Bulacan

Construction of Revetment Wall at Barangay Piel, Sta. 01+820 to Sta. 02+220, Baliuag, Bulacan is a DPWH-tracked public work in CITY OF BALIUAG (BULACAN), BULACAN, Region III. Reported contract value: ₱96,499,443.56. Status: Reported complete (DPWH). Contractor on record: M S RAMOS CONST INC FORMERLY: M S RAMOS. Figures trace to sumbong.

CITY OF BALIUAG (BULACAN), BULACAN, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱50,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23CC0131 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-01-07 → 2024-04-16

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (revetment)

₱241,249 per linear m= 1.7x the Region III median (n=12)

Contract cost ₱96,499,444 ÷ 400 linear m read from the DPWH title (“Sta. 01+820 to Sta. 02+220”; station range length (Sta. a+b to c+d)). National percentile: 79. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Bulacan

Based on the coordinates published with the DPWH record and NOAH file Bulacan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Revetment Wall at Barangay Piel, Sta. 01+820 to Sta. 02+220, Baliuag, Bulacan

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Controll Wall along Meycauayan River, Barangay Tawiran-Wawang Pulo (Sta. 2 + 494 - Sta. 2 + 608), Obando Section, Obando, Bulacan
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Bulacan 1st District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱96,499,443.56

Progress

Reported complete (DPWH)

Start Date

February 13, 2023

Target End

December 9, 2023

5. Audit