Construction of Flood Control Structure, Malibong Bata Section, Pandi, Bulacan
Construction of Flood Control Structure, Malibong Bata Section, Pandi, Bulacan is a DPWH-tracked public work in PANDI (BULACAN), BULACAN, Region III. Reported contract value: ₱43,201,412.48. Status: Reported complete (DPWH). Contractor on record: M S RAMOS CONST INC FORMERLY: M S RAMOS. Figures trace to sumbong.
Total Contract Cost




