DPWH transparency mirror

DPWH reports: Completed · 100%

Open DPWH portal record ↗

Publicly reported (according to cited sources)

  • Commission on Audit (fraud audit report) · 2025-09-18

    “One such project in Barangay Bunsuran, Pandi town, “did not match the approved bid plan” and was considered to be “another ghost project,””
    Source link (external) ↗

Publicly reported by the cited sources; not a finding by this site. Criminal or administrative charges, where cited, are described as pending unless the source states a final judgment. Right of reply / submit evidence

Construction of Slope Protection Structure24CC0297

Construction of Slope Protection Structure and Waterways, Brgy. Bunsuran (Purok 4), Pandi, Bulacan

Construction of Slope Protection Structure and Waterways, Brgy. Bunsuran (Purok 4), Pandi, Bulacan is a DPWH-tracked public work in PANDI (BULACAN), BULACAN, Region III. Reported contract value: ₱98,999,508.95. Status: Reported complete (DPWH). Contractor on record: TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC. Figures trace to sumbong.

PANDI (BULACAN), BULACAN, Region III
Region: Region III

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Waterways and Flood Control Structure along Guiguinto River, Brgy. Malis, Guiguinto, Bulacan
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0007285

₱1,480,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0005755

₱1,178,933.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0017916

₱440,428.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0007286

₱137,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0005756

₱95,671.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

15 projects · ₱1.5B total · 17 flags

4. Implementation

Contract Amount

₱98,999,508.95

Progress

Reported complete (DPWH)

Start Date

April 23, 2024

Target End

January 17, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.