Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24CC0297 was awarded at 100.00% of its ABC. Across its 15 recorded contracts, TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC was awarded at ≥99.5% of ABC 15 times (100.0%), versus 70.4% for flood-control contracts overall. It is possible that the winning bid was set just below or at the ABC due to tight competition or careful cost estimation.

Public record entityConstruction of Slope Protection Structure and Waterways, Brgy. Bunsuran (Purok 4), Pandi, Bulacan
LocationPANDI (BULACAN), BULACAN, Region IIIContract 24CC0297
Amount₱98,999,508.95100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Slope Protection Structure and Waterways, Brgy. Bunsuran (Purok 4), Pandi, Bulacan24CC0297100%January 17, 2025January 2, 2025No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 23, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Bulacan 1st District Engineering Office",
  "ratio": 0.999996542823087,
  "abcPhp": 98999851.21,
  "threshold": 0.995,
  "contractId": "24CC0297",
  "contractor": "TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC",
  "contractCostPhp": 98999508.95
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanPandiBunsuran II
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault24.4 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.