Construction of Flood Control Structure along Angat River, Barangay Lumang Bayan Plaridel, Bulacan (K019+931 to K020+231)
Construction of Flood Control Structure along Angat River, Barangay Lumang Bayan Plaridel, Bulacan (K019+931 to K020+231) is a DPWH-tracked public work in PLARIDEL (BULACAN), BULACAN, Region III. Reported contract value: ₱72,374,590.51. Status: Reported complete (DPWH). Contractor on record: TOPNOTCH CATALYST BUILDERS INC. Figures trace to sumbong.
Total Contract Cost
