Construction of Reinforced Concrete Flood Control Structure, Barangay Meyto (Purok 4 to Purok 5), Calumpit, Bulacan
Construction of Reinforced Concrete Flood Control Structure, Barangay Meyto (Purok 4 to Purok 5), Calumpit, Bulacan is a DPWH-tracked public work in CALUMPIT (BULACAN), BULACAN, Region III. Reported contract value: ₱77,199,237.53. Status: Reported complete (DPWH). Contractor on record: IM CONST CORP. Figures trace to sumbong.
Total Contract Cost
