Construction of Flood Control Structure at Guiguinto River (Bagbag Creek, Sta. 0 + 000 - Sta. 0 + 780), Barangay Malis, Guiguinto Bulacan
Construction of Flood Control Structure at Guiguinto River (Bagbag Creek, Sta. 0 + 000 - Sta. 0 + 780), Barangay Malis, Guiguinto Bulacan is a DPWH-tracked public work in GUIGUINTO (BULACAN), BULACAN, Region III. Reported contract value: ₱45,079,500.38. Status: Reported complete (DPWH). Contractor on record: L R TIQUI BUILDERS INC. Figures trace to sumbong.
Total Contract Cost

