Construction of Flood Control Structure along Bagbag Creek, Pritil Section, Guiguinto, Bulacan
Construction of Flood Control Structure along Bagbag Creek, Pritil Section, Guiguinto, Bulacan is a DPWH-tracked public work in GUIGUINTO (BULACAN), BULACAN, Region III. Reported contract value: ₱48,999,690.40. Status: Reported complete (DPWH). Contractor on record: TOPNOTCH CATALYST BUILDERS INC. Figures trace to sumbong.
Total Contract Cost
