Construction of Reinforced Concrete Flood Control Structure along Balagtas River, Barangay Dalig (Purok 2 to Purok 3), Balagtas, Bulacan
Construction of Reinforced Concrete Flood Control Structure along Balagtas River, Barangay Dalig (Purok 2 to Purok 3), Balagtas, Bulacan is a DPWH-tracked public work in BALAGTAS (BIGAA) (BULACAN), BULACAN, Region III. Reported contract value: ₱77,199,558.49. Status: Reported complete (DPWH). Contractor on record: MRB11 CONST CORP FORMERLY:MRB CONS. Figures trace to sumbong.
Total Contract Cost
