Construction of Flood Mitigation Structure24CC0172

Construction of Reinforced Concrete Flood Control Structure at Barangay Catulinan, Baliuag, Bulacan

Construction of Reinforced Concrete Flood Control Structure at Barangay Catulinan, Baliuag, Bulacan is a DPWH-tracked public work in CITY OF BALIUAG (BULACAN), BULACAN, Region III. Reported contract value: ₱77,199,553.69. Status: Reported complete (DPWH). Contractor on record: GLOBALCRETE BUILDERS INC. Figures trace to sumbong.

CITY OF BALIUAG (BULACAN), BULACAN, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱20,000

    Probable match · score 0.91

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIII-24-0007285 · ₱1,480,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24CC0172 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-01-30 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Bulacan

Based on the coordinates published with the DPWH record and NOAH file Bulacan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Reinforced Concrete Flood Control Structure at Barangay Catulinan, Baliuag, Bulacan

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 91%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Bagbag Creek, Barangay Pritil, Guiguinto, Bulacan
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0007285

₱1,480,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0005755

₱1,178,933.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0017916

₱440,428.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0007286

₱137,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0005756

₱95,671.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

40 projects · ₱2.7B total · 0 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTO TOMAS RIVER, SAN FELIPE, ZAMBALES

Region III, Region III

2024₱193.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE & SPECIAL SUPPORT PROGRAM-CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES-SAN ILDEFONSO-RR STA. AKLE RD. CONNECTING OLD CAGAYAN VALLEY RD. & PULONG SAMPALOC-AKLE-BUASAW RD. IN SUPPORT OF THE AGRIBUSINESSES, DR

Region III, Region III

2018₱166.1M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS, DAANG MAHARLIKA (LZ), INCLUDING ROW, BULACAN 3RD LEGISLATIVE DISTRICT, PROVINCE OF BULACAN

Region III, Region III

2018₱144.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASS/DIVERSION ROAD, CANDABA SAN MIGUEL BY-PASS ROAD, PACKAGE 1, INCL. ROW, BULACAN

Bulacan 2nd DEO, Region III

2018₱140.0M
Reported complete (DPWH)

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK PHASE 6, SAN ILDEFONSO, BULACAN

Region III, Region III

2024₱135.1M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK PHASE 5, SAN ILDEFONSO, BULACAN

Region III, Region III

2024₱135.1M
Past target date (DPWH On-Going)
View all 40 projects →

4. Implementation

Contract Amount

₱77,199,553.69

Progress

Reported complete (DPWH)

Start Date

February 28, 2024

Target End

October 24, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanCity of BaliwagTilapayong
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Man-Yi 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.