Construction of Flood Control Structure along Balagtas River, Barangay Malibong, Pandi, Bulacan
Construction of Flood Control Structure along Balagtas River, Barangay Malibong, Pandi, Bulacan is a DPWH-tracked public work in PANDI (BULACAN), BULACAN, Region III. Reported contract value: ₱69,295,690.87. Status: Reported complete (DPWH). Contractor on record: TOPNOTCH CATALYST BUILDERS INC. Figures trace to sumbong.
Total Contract Cost
