Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 22CC0106 and 22CC0232 have near-identical descriptions about 239 m apart (funding year 2022; ₱69.30M, ₱59.40M). Worth checking whether they cover the same works. It is possible that the first contract covers Phase 1 and the second covers Phase 2 of the same project area.

Public record entityConstruction of Flood Control Structure along Balagtas River, Barangay Malibong, Pandi, Bulacan
LocationPANDI (BULACAN), BULACAN, Region IIIContract 22CC0106
Amount₱69,295,690.87 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure along Balagtas River, Barangay Malibong, Pandi, Bulacan22CC0106Flood control100%November 20, 2022November 20, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 24, 2022 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "22CC0106",
  "coordinates": {
    "lat": 14.839588,
    "lon": 120.92349
  },
  "municipality": "PANDI (BULACAN)",
  "distanceMeters": 238.90170895831437,
  "titleSimilarity": 0.979381443298969
}

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanBalagtasDalig
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Active fault24.0 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.