DPWH transparency mirror

DPWH reports: Completed · 100%

Open DPWH portal record ↗

Publicly reported (according to cited sources)

  • Independent Commission for Infrastructure (4th interim report) · 2025-11-06

    “The available records and CoA's technical inspection showed the project was never constructed at the designated location”
    Source link (external) ↗

Publicly reported by the cited sources; not a finding by this site. Criminal or administrative charges, where cited, are described as pending unless the source states a final judgment. Right of reply / submit evidence

Construction of Slope Protection Structure24CC0149

Construction/Improvement of Slope Protection Structure and Waterways, Brgy. Bambang, Bocaue, Bulacan

Construction/Improvement of Slope Protection Structure and Waterways, Brgy. Bambang, Bocaue, Bulacan is a DPWH-tracked public work in BOCAUE (BULACAN), BULACAN, Region III. Reported contract value: ₱98,998,749.59. Status: Reported complete (DPWH). Contractor on record: TOPNOTCH CATALYST BUILDERS INC / BEAM TEAM DEVELOPER SPECIALIST INC. Figures trace to sumbong.

BOCAUE (BULACAN), BULACAN, Region III
Region: Region III

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Waterways and Flood Control Structure along Guiguinto River, Brgy. Malis, Guiguinto, Bulacan
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0007285

₱1,480,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0005755

₱1,178,933.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0017916

₱440,428.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0007286

₱137,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0005756

₱95,671.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱98,998,749.59

Progress

Reported complete (DPWH)

Start Date

April 23, 2024

Target End

January 17, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.