Buildings and Facilities19CG0059

REHABILITATION / REPAIR / IMPROVEMENT OF MULTI - PURPOSE BUILDING (BARANGAY HALL), BARANGAY SAN PEDRO, MINALIN, PAMPANGA

REHABILITATION / REPAIR / IMPROVEMENT OF MULTI - PURPOSE BUILDING (BARANGAY HALL), BARANGAY SAN PEDRO, MINALIN, PAMPANGA is a DPWH-tracked public work in Pampanga 1st DEO, Region III. Reported contract value: ₱946,027.45. Status: Reported complete (DPWH). Contractor on record: CHOLO CONST AND TRADING. Figures trace to dpwh.

Pampanga 1st DEO, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROII-19-0008831

₱269,451.00 · FY2019

Released to Veterans General Hospital (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

139 projects · ₱1.7B total · 0 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION AT SAN ROQUE BITAS CREEK, ARAYAT, PAMPANGA

Pampanga 1st DEO, Region III

2025₱91.7M
Past target date (DPWH On-Going)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT PALINLANG CREEK, ARAYAT, PAMPANGA

Pampanga 1st DEO, Region III

2025₱91.6M
Reported complete (100% progress, DPWH status On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONCRETING OF SLOPE PROTECTION AT INUMAN BAKA STA. ANA-ARAYAT PORTION, PAMPANGA PHASE II

Pampanga 1st DEO, Region III

2025₱91.5M
Past target date (DPWH On-Going)

Rehabilitation of River Channel and Construction of Concrete Slope Protection, Malisik R.C., Candaba, Pampanga

CANDABA (PAMPANGA), PAMPANGA, Region III

2022₱82.1M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BALIWAG - CANDABA - STA. ANA RD. - K0067+433 - K0067+571, CANDABA, PAMPANGA

Pampanga 1st DEO, Region III

2019₱67.9M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONCRETING OF SLOPE PROTECTION AT INUMAN BAKA STA. ANA-ARAYAT PORTION, PAMPANGA PHASE I

Pampanga 1st DEO, Region III

2025₱64.2M
Past target date (DPWH On-Going)
View all 139 projects →

4. Implementation

Contract Amount

₱946,027.45

Progress

Reported complete (DPWH)

Start Date

June 18, 2019

Target End

July 17, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.