Buildings and Facilities16AH0169

CONST'N.OF THREE(3) STOREY,NINE(9)CL, S/B AT BAGUINAY NHS, MANAOAG, PANGASINAN

CONST'N.OF THREE(3) STOREY,NINE(9)CL, S/B AT BAGUINAY NHS, MANAOAG, PANGASINAN is a DPWH-tracked public work in Pangasinan 2nd DEO, Region I. Reported contract value: ₱15,322,141.79. Status: Reported complete (DPWH). Contractor on record: STO CRISTO CONST. Figures trace to dpwh.

Pangasinan 2nd DEO, Region I
Region: Region I

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-B-16-0008928 · ₱712,300 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16AH0169 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-02-11 → 2025-08-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,702,460 per classroom= 1.0x the Region I median (n=898)

Contract cost ₱15,322,142 ÷ 9 classroom read from the DPWH title (“NINE(9)CL”; classroom count in title). National percentile: 51. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST'N.OF THREE(3) STOREY,NINE(9)CL, S/B AT BAGUINAY NHS, MANAOAG, PANGASINAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Agno River Basin Flood Control Project - Construction of Bank Protection, Brgy. Oraan West, Manaoag, Pangasinan
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-B-16-0008928

₱712,300.00 · FY2016

Released to 000 - Philippine Commission on Women (National Com To cover (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

490 projects · ₱18.9B total · 0 flags

4. Implementation

Contract Amount

₱15,322,141.79

Progress

Reported complete (DPWH)

Start Date

July 28, 2016

Target End

January 23, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.