CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MANABA RIVER CONTROL, STA. 0+000 - STA. 0+274.20 (LEFT SIDE), STA. 0+069.00 - STA. 0+274.20 (RIGHT SIDE), GARCIA HERNANDEZ, BOHOL
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MANABA RIVER CONTROL, STA. 0+000 - STA. 0+274.20 (LEFT SIDE), STA. 0+069.00 - STA. 0+274.20 (RIGHT SIDE), GARCIA HERNANDEZ, BOHOL is a DPWH-tracked public work in Bohol 3rd DEO, Region VII. Reported contract value: ₱11,638,004.00. Status: Reported complete (DPWH). Contractor on record: MUANA CONST AND DEVELOPMENT CORP FORMERLY. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost