DPWH projects in Bohol

4,392 DPWH public works projects are recorded in Bohol (Region Vii), with start dates from 2015 to 2025. Recorded contract values total about ₱60,700,714,913.28. 4,053 are recorded at 100% progress and 269 are flood control works. Figures are as recorded by DPWH; they are not findings.

Largest recorded projects

  1. Reconstruction of the Tigbao Bridge in Bagumbayan, Loboc, Province of Bohol Into A Reinforced Concrete Deck Girder (Rcdg) Bridge, Including Road Approach Widening and River Slope Protection On Each Side of the Bridge, Loboc, Bohol Sta. 0+006.00 - Sta. 0+0₱241,195,026.48
  2. Sustainable Infrastructure Project Alleviating Gaps (Sipag)- Flood Mitigation Structures Protecting Major/Strategic Public Buildings/Facilities. Construction of Tugas Seawall, Pres. Carlos P. Garcia, Bohol₱144,737,235.07
  3. Convergence and Special Support Program - Special Road Fund - Motor Vehicle User'S Charge (Mvuc) As Per R.A. 11239 - Installation of Road Safety Devices Along Tagbilaran East Rd (Tagbilaran-Jagna) - K0193 + 568 - K0193 + 757; K0193 + 804 - K0193 + 878; K0₱144,720,012.98
  4. Oo2: Protect Lives and Properties Against Major Floods-Flood Management Program - Const./Maint. of Flood Mitigation Structures & Drainage Systems - Const. of Flood Mitigation Structure Along Gabayan River, Candijay, Bohol, Sta. 0+600.00 - Sta. 1+068.00, S₱144,695,000.00
  5. Oo2: Protect Lives and Properties Against Major Floods - Flood Management Program - Const./Maint. of Flood Mitigation Structures and Drainage System - Const. of Flood Mitigation Structure Along Casbu River, Candijay, Bohol, Sta. 0+393.84 - Sta. 0+947.84₱144,669,997.60
  6. Organizational Outcome 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Casbu River Flood Control, Candijay, Bohol Sta. 0+03₱144,664,412.82
  7. Organizational Outcome 2: Protect Lives and Properties Against Major Floods- Flood Management Program -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems- Construction of Clarin Seawall at Clarin, Bohol₱144,650,021.93
  8. Organizational Outcome 2: Protect Lives and Properties Against Major Floods- Flood Management Program -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems- Construction of Bien Unido Seawall at Bien Unido, Bohol₱144,650,002.73
  9. Construction of Tumuran - Sarangani River Control, Phase Ii, Candijay, Bohol₱144,590,167.80
  10. Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Drainage Structure, Jct. Tagbilaran North Road K0002 + 170 and PeñAflor Street Leading to Outfall With Integrated Waste Water Treatment, Barangay Cogon, Barang₱144,565,000.00
  11. Construction of Tagbilaran City Wharp Port to Picr Songculan - Totolan, Dauis, Bohol₱144,500,000.00
  12. Construction of Talenceras Flood Control at Talenceras, Tubigon, Bohol₱144,312,978.90
  13. Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads -Jct (Lir) -Carmen -Sagbayan - Bacani Rd -K0165 + 788 - K0167 + 003, K0167 + 361 - K0168 + 661₱142,050,283.67
  14. Oo1: Ensure Safe and Reliable National Road System Asset Preservation Program - Preventive Maintenance - Tertiary Roads - Jct. Dat-An Carmen- Sierra Bullones - Pilar - Alicia Rd - K0072+(-375) - K0073+013, K0075+025 - K0076+108₱140,495,831.98
  15. Organizational Outcome 1: Ensure Safe and Reliable National Road System Asset Preservation Program Preventive Maintenance - Secondary Roads the President Carlos P. Garcia Circumferential Rd - K0224 + 000 - K0225 + 000, K0235 + 000 - K0236 + 670.00₱140,465,716.67
  16. Convergence and Special Support Program - Sipag- Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/Facilities Construction of Napo - Cayacay Flood Control Structure, Napo, Alicia, Bohol Sta. 0+100 -Sta.0+120 -Section 1; Sta.0+388₱140,400,803.52
  17. Construction of Gabayan River Flood Control, Candijay, Bohol₱139,442,021.80
  18. Oo1: Ensuresafe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Loay Interior Rd - K0154 + 000 - K0154 + 583, K0154 + 611 - K0155 + 293, K0156 + 329 - K0156 + 560 ,₱132,106,773.27
  19. Construction of Wahig River Control Structure, Pamacsalan Area, Pilar, Bohol₱130,419,495.00
  20. Oo1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads- the President Carlos P. Garcia Circumferential Rd, K0177+398 - K0178+477, K0184+296 - K0185+157₱126,225,622.09
  21. Organizational Outcome 1: Ensure Safe and Reliable National Road System Asset Preservation Program Preventive Maintenance - Secondary Roads the President Carlos P. Garcia Circumferential Rd - K0200 + 000 - K0201 + 000, K0208 + 000 - K0209 + 235₱122,765,099.79
  22. Construction/ Improvement of Access Roads Leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - Roll-It) Jct. (Ter) Alburquerque-Sikatuna Road in Support of the Agribusiness Industry, S₱120,500,000.00
  23. Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Loay Interior Rd - K0160+214- K0160+730 , K0173+474 - K0174+225, K0197+509 - K0198+060₱112,496,223.73
  24. Convergence and Special Support Program Basic Infrastructure Program (Bip) Access Roads and/Or Bridges From the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities Rehabilitation of Jct. (Lir) Quinoguitan (Loboc) - Sevilla - Hanopol (₱112,385,442.97
  25. Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Jct (Ter) - Jagna - Sierra Bullones Rd - K0063 + (-478) -K0063+371, K0065 + 000 - K0065 + 860₱111,510,115.46