CCMALUENDA CONST INC FORMERLY:C C M CONST is listed as a company organization in Philippine public procurement records on this site, with 63 linked DPWH project(s) totaling about ₱2,084,418,605.05. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
CCMALUENDA CONST INC FORMERLY:C C M CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 63
- Total value
- ₱2,084,418,605.05
- Published flags
- 0
- Region
- Bohol 2nd DEO · Region VII
Online presence
Google Maps: CCMALUENDA Construction Inc.★ 3.4 (5 reviews)Google Maps, 2026-10-22
0876 C P Garcia North Ave, Tagbilaran City, 6300 Bohol
Licensed officers (PCAB)
- Cesar C. Maluenda · Authorized Managing Officer (PCAB license 11043) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for CCMALUENDA CONST INC FORMERLY:C C M CONST — not an accusation or finding of wrongdoing.
Score: 88.60 / 100 · Projects in sample: 63 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 84.1/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 84.1
- lateCompletedProjects
- 9
- onTimeCompletedProjects
- 51
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 63
- pastTargetOngoingProjects
- 3
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 63
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 63
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 63
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 63
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 62 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), KINABAG-AN - TALISAY ROAD LEADING TO HAYAHAY BEACH RESORT AND TREASURE ISLAND RESORT,22H00026 · ₱130,275,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, JCT. PICR VIA BIKING-LIBAONG-BOLOD ACCESS ROAD LEADING TO NEW BOHOL INTERNATIONAL AIRPORT, INCL. ROW, BOHOL PROVINCE18H00011 · ₱94,749,563.23 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT - TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECTION) K0003+000-K0006+060, K0011+000-K0012+598, K0012+861-K0013+386.7, TAGBILARAN CITY AND MARIBOJOC, BOHOL18HA0036 · ₱78,370,643.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS- (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- CONSTRUCTION OF ACCESS ROAD LEADING TO UBAY PORT VIA RECLAMATION AREA, PACKAGE 3, UBA22HC0086 · ₱65,522,066.38 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- TAGBILARAN EAST RD (TAGBILARAN- JAGNA)- K0138+128-K0139+599, UBAY, BOHOL24HC0026 · ₱60,645,425.00 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS, REHABILITATION/RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROADS, INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY-4, SECONDARY ROADS, TAGBILARAN NORTH ROAD16H00066 · ₱60,312,219.52 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION (CONCRETING) OF ROADS AT SITIO LOWER CAMBAJA, BARANGAY23HB0075 · ₱59,399,999.60 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- ANTEQUERA-SAN ISIDRO-LIBERTAD (TUBIGON) RD- K0033+000-K0034+498, SAN ISIDRO, BOHOL23HC0087 · ₱58,721,532.18 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD -K0131+227-K0132+334, K0134+706-K0135+767, UBAY, BOHOL25HC0086 · ₱49,972,678.95 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROADS, ALICIA, BOHOL SECTION 1: STA. 0+000.00 - ST24HB0105 · ₱49,499,981.85 · mapped
- CONSTRUCTION/ CONCRETING OF DEL ROSARIO - BOYOG PROPER ROAD, BALILIHAN, BOHOL23HA0122 · ₱48,930,000.00 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)-CONCRETING OF ROAD, COGON ROAD LEADING TO COGON NATURE'S GEM, COGON, BALILIHAN, BOHOL24HA0043 · ₱48,172,148.80 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS - ACCESS ROAD LEADING TO UBAY PORT VIA RECLAMATION AREA, UBAY, BOHOL, PACKAGE II22HC0069 · ₱47,530,101.45 · mapped
- CONSTRUCTION/IMPROVEMEMNT OF ACCESS ROAD LEADING TO AIRTPORTS - JCT. DAUIS-PANGLAO ROAD TO LOURDES-BOLOD-TAWALA LEADING TO NEW BOHOL INTERNATIONAL AIRPORT, PANGLAO, BOHOL19HA0060 · ₱47,037,603.00 · mapped
- OFF CARRIAGE WAY IMPROVEMENT (PAVING OF SHOULDERS WITH DRAINAGE IMPROVEMENT) AT TAGBILARAN NORTH ROA15HA0165 · ₱45,463,950.00 · mapped
- MFO 1 NATIONAL ROAD NETWORK SERVICE ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTI17HA0011 · ₱45,300,281.00 · mapped
- CLUSTER 5-NETWORK DEVELOPMENT, OFF-CARRIAGEWAY IMPV'T. INCLUDING DRAINAGE:PAVING OF SHOULDER OF TER(15HC0147 · ₱45,104,518.65 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- TAGBILARAN EAST RD (TAGBILARAN-JAGNA)- K0130+128-K0131+227, UBAY, BOHOL24HC0030 · ₱44,424,792.15 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- ROAD WIDENING- SECONDARY ROADS- TAGBILARAN EAST RD (TAGBILARAN-JAGNA) - K0133+599-K0134+700, UBAY, BOHOL23HC0002 · ₱43,064,004.83 · mapped
- IMPROVEMENT OF BARANGAY CASATE-TUBOG-BUGANG ROAD, SECTION 3, UBAY, BOHOL20HC0050 · ₱42,289,854.00 · mapped
- CONSTRUCTION OF ROAD LEADING TO UBAY BUS TERMINAL, UBAY, BOHOL21HC0180 · ₱42,083,581.78 · mapped
- IMPROVEMENT OF BRGY. CASATE-TUBOG-BUGANG ROAD (SECTION 3), UBAY, BOHOL19HC0075 · ₱41,857,535.50 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD -K0125+038-K0126+228, TRINIDAD, BOHOL25HC0028 · ₱39,908,007.35 · mapped
- NETWORK DEVELOPMENT:OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA) KO122+136 -KO124+000, KO150+484-KO152+000 AND KO153+000 - KO153+569,TRINIDAD AND UBAY, BOHOL16HC0086 · ₱39,732,228.00 · mapped
- CONSTRUCTION OF ROAD FROM PUROK 4 TO PUROK 8 OF BARANGAY CANANGCAAN, CORELLA, BOHOL25HA0117 · ₱38,809,397.60
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROAD AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, SAN FRANCISCO-SAN PASCU23HC0011 · ₱38,599,951.15 · mapped
- MFO 3-MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURE-CONSTRUCTION/IMPROVEMENT OF ACCS17HA0016 · ₱38,078,918.00 · mapped
- CONSTRUCTION (COMPLETION) OF HAGUILANAN GRANDE ROAD, BALILIHAN, BOHOL19HA0165 · ₱37,320,063.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF ROAD, BARANGAY KATIPUNAN22HB0068 · ₱34,299,992.63 · mapped
- NETWORK DEVELOPMENT OFF-CARRIAGEWAY IMPROVEMENT: TAGBILARAN EAST RD (TAGBILARAN-JAGNA)- K0140+226 - K0141+800; K0144+076 - K0145+000, K0145+512 - K0146+000, UBAY, BOHOL20HC0013 · ₱33,779,406.55 · mapped
- CONSTRUCTION/CONCRETING OF ROAD, BRGY. POBLACION-BRGY.TUMOC, SAN MIGUEL, BOHOL20HC0168 · ₱33,594,096.62 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES- JCT. (LIR) MAHAYAG (SAN MIGUEL)- DANAO ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY- SAN MIGUEL, BOHOL19HC0127 · ₱32,309,120.50 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BARANGAY BUSAO (MARIBOJOC) ALONG RIVER LEADING TO TUBIG DAKU LEADING TO INAMBACAN CAVE AND SPRING, MARIBOJOC, BOHOL21HA0106 · ₱29,925,070.00 · mapped
- CONSTRUCTION OF ROAD, BRGY. LOURDES TO BRGY. TANGNAN, PANGLAO, BOHOL25HA0102 · ₱29,045,799.66 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATION AT HINLAYAGAN ILAYA-BANLASAN-SAN ISIDRO ROAD LEADING TO KAWASAN FALLS, BRGY. HINLAYAGAN ILAYA, TRINIDAD, BOHOL18HC0042 · ₱24,902,417.34 · mapped
- CLUSTER 6-NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPV'T. INCLUDING DRAINAGE; PAVING OF SHOULDER OF LIR15HC0148 · ₱21,477,550.80 · mapped
- WIDENING OF ROAD, BIEN UNIDO PROVINCIAL ROAD LEADING TO THE MUNICIPAL GYM AND POLICE STATION, BIEN UNIDO, BOHOL17HC0028 · ₱18,809,562.56 · mapped
- CONVERGENCE AND SPECIAL PROGRAM- CONST./IMPVT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-M. CABIGUHAN-KINAN-OWAN-KAUSWAGAN-DIIS(TRINIDAD)-CANDIIS, SAN CARLOS-MAGTANGTANG DANAO LEADING TO DANAO ADVENTURE PARK, BRGY. KAUSWAGAN, TRINIDAD, BOHOL19HC0146 · ₱18,620,340.00 · mapped
- 003:CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONST./IMPV'T. OF ACCESS ROAD LEADING TO SEAPORTS - ACCESS ROAD LEADING TO TAPAL WHARF VIA ROAD TO PALAYAN NG BAYAN-BRGY. IMELDA AND BENLIW, UBAY, BOHOL19HC0054 · ₱18,620,123.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-HINLAYAGAN ILAYA-BANLASAN-SAN ISIDRO ROAD LEADING TO KAWASAN FALLS, BRGY.HINLAYAGAN ILAYA, TRINIDAD, BOHOL19HC0129 · ₱18,619,825.65 · mapped
- 003: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS-ACCESS ROAD LEADING TO UBAY PORT VIA RECLAMATION AREA, UBAY, BOHOL19HC0067 · ₱18,619,450.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-UBUJAN-MANGA-COSTAL ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, TAGBILARAN CITY, BOHOL18HA0039 · ₱18,429,262.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS AT M. CABIGUHAN-KINAN-OWAN-KAUSWAGAN-DIIS (TRINIDAD)-CANDIIS, SAN CARLOS-MAGTANGTANG, DANAO LEADING TO DANAO ADVENTURE PARK, BRGY. KAUSWAGAN, TRINIDAD, BOHOL18HC0046 · ₱18,410,061.70 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS AT LOMANGOG BRGY. ROAD LEADING TO UBAY STOCK FARM, BRGY. LOMANGOG, UBAY, BOHOL18HC0047 · ₱18,408,639.10 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT - JCT (TNR) CORTES - BALILIHAN - CATIGBIAN - MACAAS RD - K0019+000-K0019+906, K0019+912-K0020+00020HA0032 · ₱18,395,370.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATION AT BARANGAY TAPAL WHITE BEACH, UBAY, BOHOL18HC0022 · ₱18,391,200.00 · mapped
- CONSTRUCTION OF TALOTO-UBUJAN-MANGA COASTRAL ROAD, TAGBILARAN CITY, BOHOL STA. 000+000-STA. 001+282.17HA0040 · ₱15,805,729.00 · mapped
- 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROADS-UBAY BY-PASS RD- K0137+(607)-K0137+(-447), K0137+095-K0137+351, UBAY, BOHOL20HC0010 · ₱15,691,388.60 · mapped
- ASSET PRESERVATION - MAINTENANCE OF ROAD: CONCRETE REBLOCKING TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA), K0148+000-K0149+000 & K0151+000-K0151+1002, UBAY, BOHOL18HC0020 · ₱15,612,466.49 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT - PANGLAO ISLAND CIRCUMFERENTIAL ROAD - (S00064BH) K0012+067 - K0012+567, (S00065BH) K0007+500 - K0008+00020HA0005 · ₱14,879,280.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 11043
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Sep 27, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 11043); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
4 evaluations listed across 3 GPPB CPES releases; average final rating 91.4% over 1 rated project; 4 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Aug 23, 2023 | DPWH | ₱42,585,000.00 | On-going | 79.5% | — | 36th, p. 40 |
| May 31, 2023 | DPWH | ₱42,585,000.00 | On-going | 90.5% | — | 36th, p. 40 |
| Mar 8, 2022 | DPWH | ₱31,525,070.00 | Completed | 93.1% | 91.4% | 35th, p. 32 |
| Nov 5, 2019 | DPWH (JV) | ₱42,603,135.00 | On-going | 89.3% | — | 40th, p. 185 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →