Flood Control and Drainage21HA0106

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BARANGAY BUSAO (MARIBOJOC) ALONG RIVER LEADING TO TUBIG DAKU LEADING TO INAMBACAN CAVE AND SPRING, MARIBOJOC, BOHOL

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BARANGAY BUSAO (MARIBOJOC) ALONG RIVER LEADING TO TUBIG DAKU LEADING TO INAMBACAN CAVE AND SPRING, MARIBOJOC, BOHOL is a DPWH-tracked public work in Bohol 1st DEO, Region VII. Reported contract value: ₱29,925,070.00. Status: Reported complete (DPWH). Contractor on record: CCMALUENDA CONST INC FORMERLY:C C M CONST. Figures trace to dpwh.

Bohol 1st DEO, Region VII
Region: Region VII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱32,176

    Probable match · score 0.92

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21HA0106 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-08-25 → 2021-07-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Bohol

Based on the coordinates published with the DPWH record and NOAH file Bohol.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BARANGAY BUSAO (MARIBOJOC) ALONG RIVER LEADING TO TUBIG DAKU LEADING TO INAMBACAN CAVE AND SPRING, MARIBOJOC, BOHOL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 92%

UACS
18001
Amount
₱32,176,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures at Barangay Busao (Maribojoc) along river leading to Tubig Daku leading to Inambacan Cave and Spring, Maribojoc, Bohol
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Bohol 1st DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

63 projects · ₱2.1B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), KINABAG-AN - TALISAY ROAD LEADING TO HAYAHAY BEACH RESORT AND TREASURE ISLAND RESORT,

Region VII, Region VII

2022₱130.3M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, JCT. PICR VIA BIKING-LIBAONG-BOLOD ACCESS ROAD LEADING TO NEW BOHOL INTERNATIONAL AIRPORT, INCL. ROW, BOHOL PROVINCE

Region VII, Region VII

2018₱94.7M
Reported complete (DPWH)
No sat.

OFF-CARRIAGEWAY IMPROVEMENT - TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECTION) K0003+000-K0006+060, K0011+000-K0012+598, K0012+861-K0013+386.7, TAGBILARAN CITY AND MARIBOJOC, BOHOL

Bohol 1st DEO, Region VII

2018₱78.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS- (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- CONSTRUCTION OF ACCESS ROAD LEADING TO UBAY PORT VIA RECLAMATION AREA, PACKAGE 3, UBA

Bohol 2nd DEO, Region VII

2022₱65.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- TAGBILARAN EAST RD (TAGBILARAN- JAGNA)- K0138+128-K0139+599, UBAY, BOHOL

Bohol 2nd DEO, Region VII

2024₱60.6M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION OF NATIONAL ROADS, REHABILITATION/RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROADS, INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY-4, SECONDARY ROADS, TAGBILARAN NORTH ROAD

Region VII, Region VII

2016₱60.3M
Reported complete (DPWH)
View all 63 projects →

4. Implementation

Contract Amount

₱29,925,070.00

Progress

Reported complete (DPWH)

Start Date

March 26, 2021

Target End

March 4, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)BoholMaribojocBusao
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.