GAA 2025 OO-125HC0086

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD -K0131+227-K0132+334, K0134+706-K0135+767, UBAY, BOHOL

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD -K0131+227-K0132+334, K0134+706-K0135+767, UBAY, BOHOL is a DPWH-tracked public work in Bohol 2nd DEO, Region VII. Reported contract value: ₱49,972,678.95. Status: Past target date (DPWH On-Going). Contractor on record: CCMALUENDA CONST INC FORMERLY:C C M CONST. Figures trace to dpwh.

Bohol 2nd DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-B-25-0004379 · ₱231,049,000 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25HC0086 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    75% reported · imagery 2015-07-12 → 2025-07-09

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱23,050,129 per km= 0.6x the Region VII median (n=130)

Contract cost ₱49,972,679 ÷ 2.168 km read from the DPWH title (“K0131+227-K0132+334; K0134+706-K0135+767”; K-post / station range length). National percentile: 14. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD -K0131+227-K0132+334, K0134+706-K0135+767, UBAY, BOHOL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Protection Dike, Cahayag CIS, Tubigon, Bohol
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-B-25-0004379

₱231,049,000.00 · FY2025

Released to Bohol 2nd DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

63 projects · ₱2.1B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), KINABAG-AN - TALISAY ROAD LEADING TO HAYAHAY BEACH RESORT AND TREASURE ISLAND RESORT,

Region VII, Region VII

2022₱130.3M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, JCT. PICR VIA BIKING-LIBAONG-BOLOD ACCESS ROAD LEADING TO NEW BOHOL INTERNATIONAL AIRPORT, INCL. ROW, BOHOL PROVINCE

Region VII, Region VII

2018₱94.7M
Reported complete (DPWH)
No sat.

OFF-CARRIAGEWAY IMPROVEMENT - TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECTION) K0003+000-K0006+060, K0011+000-K0012+598, K0012+861-K0013+386.7, TAGBILARAN CITY AND MARIBOJOC, BOHOL

Bohol 1st DEO, Region VII

2018₱78.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS- (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- CONSTRUCTION OF ACCESS ROAD LEADING TO UBAY PORT VIA RECLAMATION AREA, PACKAGE 3, UBA

Bohol 2nd DEO, Region VII

2022₱65.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- TAGBILARAN EAST RD (TAGBILARAN- JAGNA)- K0138+128-K0139+599, UBAY, BOHOL

Bohol 2nd DEO, Region VII

2024₱60.6M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION OF NATIONAL ROADS, REHABILITATION/RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROADS, INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY-4, SECONDARY ROADS, TAGBILARAN NORTH ROAD

Region VII, Region VII

2016₱60.3M
Reported complete (DPWH)
View all 63 projects →

4. Implementation

Contract Amount

₱49,972,678.95

Progress

Past target date (DPWH On-Going)

Start Date

April 3, 2025

Target End

December 2, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)BoholUbayAchila
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.