GAA 2023 CSSP23HB0179

RECONSTRUCTION OF THE TIGBAO BRIDGE IN BAGUMBAYAN, LOBOC, PROVINCE OF BOHOL INTO A REINFORCED CONCRETE DECK GIRDER (RCDG) BRIDGE, INCLUDING ROAD APPROACH WIDENING AND RIVER SLOPE PROTECTION ON EACH SIDE OF THE BRIDGE, LOBOC, BOHOL STA. 0+006.00 - STA. 0+0

RECONSTRUCTION OF THE TIGBAO BRIDGE IN BAGUMBAYAN, LOBOC, PROVINCE OF BOHOL INTO A REINFORCED CONCRETE DECK GIRDER (RCDG) BRIDGE, INCLUDING ROAD APPROACH WIDENING AND RIVER SLOPE PROTECTION ON EACH SIDE OF THE BRIDGE, LOBOC, BOHOL STA. 0+006.00 - STA. 0+0 is a DPWH-tracked public work in Bohol 3rd DEO, Region VII. Reported contract value: ₱241,195,026.48. Status: Past target date (DPWH On-Going). Contractor on record: KMCM BUILDERS AND DEVELOPMENT CORP. Figures trace to dpwh.

Bohol 3rd DEO, Region VII
Region: Region VII

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure, Katubuan Bridge River Control, Dagohoy, Bohol
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Bohol 3rd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

1 projects · ₱241.2M total · 0 flags

4. Implementation

Contract Amount

₱241,195,026.48

Progress

Past target date (DPWH On-Going)

Start Date

April 30, 2024

Target End

June 25, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.