N N YU CONST INC FORMERLY: YU CONST is listed as a company organization in Philippine public procurement records on this site, with 89 linked DPWH project(s) totaling about ₱4,436,122,186.76. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
N N YU CONST INC FORMERLY: YU CONST
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 89
- Total value
- ₱4,436,122,186.76
- Published flags
- 0
- Region
- Bohol 1st DEO · Region VII
Public Record Grade
A transparent, data-derived summary of reported public records for N N YU CONST INC FORMERLY: YU CONST — not an accusation or finding of wrongdoing.
Score: 87.00 / 100 · Projects in sample: 89 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 79.1/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 79.1
- lateCompletedProjects
- 5
- onTimeCompletedProjects
- 75
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 89
- pastTargetOngoingProjects
- 9
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 89
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 89
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 89
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 89
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 86 geotagged projects (largest by contract value) — Open full map
- LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF JCT. (TER) LA UNION (CANDIJAY)-CABULAO-LUNGSODAAN-POOK ROAD (MABINI), CANDIJAY, BOHOL, SECTION 1: STA.0+000-STA.21H00013 · ₱147,201,100.00 · mapped
- MF0 1-NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, P00106520VS, SECONDARY ROADS, S00030BH, TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECT.)17H00017 · ₱146,951,059.26 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE ALONG CASBU RIVER, CANDIJAY, BOHOL, STA. 0+393.84 - STA. 0+947.8425HB0045 · ₱144,669,997.60 · mapped
- MF0 3- CONSTRUCTION AND MAINTENANCE OF OTHER INFRASTRUCTURE, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, P00131017VS JCT. (TER) GUINDULMAN-ANDA BADIANG COGTONG ROAD LEADING TO BEACHES AND RESORTS, CANDIJAY, BOHOL 3L17H00013 · ₱142,434,053.00
- LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD, SIKATUNA TO SEVILLA, BOHOL PROVINCE, SECTION 1: STA.0+000 TO STA.1+106, SECTION21H00009 · ₱125,450,000.00 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) JCT. (TER) ALBURQUERQUE-SIKATUNA ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, S23HA0106 · ₱120,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), ACCESS ROAD LEADING TO TAPAL WHARF VIA ROAD TO PALAYAN NG BAYAN- BRGYS. IMELDA AND B22H00029 · ₱119,045,295.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, JCT (TNR) CORTES - BALILIHAN - CATIGBIAN22H00034 · ₱106,150,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS- SECONDARY ROADS, TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECT) - K0025 + 400 - K0026 + 0123H00031 · ₱97,464,986.03 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM -TRIP), BRGY. PROGRESO - BRGY. CAMBAO LEADING TO ALICIA PANORAMIC PARK, ALICIA, BOHOL, SECTION 1: ST21HB0118 · ₱96,497,507.00 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - JCT (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD - K0048 + 400 - K0048 + 49125HA0098 · ₱96,400,000.00 · mapped
- REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ANTEQUERRA - BALILIHAN VIA DOROL ROAD, BALILIHAN, BOHOL25HA0071 · ₱96,400,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, JCT. DAUIS-PANGLAO ROAD TO LOURDES-BOHOL-TAWALA LEADING TO NEW BOHOL INTERNATIONAL AIRPORT, INCL. ROW, BOHOL PROVINCE18H00009 · ₱94,749,902.33 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, WAHIG RIVER PHASE 3, ILAUD, PILAR, BOHOL STA.0+323.00 - STA.0+470.00 R/S, STA.024HB0186 · ₱93,604,999.25 · mapped
- NETWORK DEVELOPMENT, OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA) K0157+500-K0158+500, K0164+000-K0164+1018, K0176+861-K0177+861,K0184+000-K0185+000,K0204+000-K0204+760, BOHOL PROVINCE16H00031 · ₱87,750,000.00 · mapped
- CONSTRUCTION OF SIKATUNA-BALILIHAN VIA CAN-AGONG ROAD, SIKATUNA AND BALILIHAN, BOHOL22HA0086 · ₱79,199,454.70 · mapped
- Construction of Flood Control Canhaway and Sitio Ponod, Barangay Sawang, Guindulman, Bohol Phase 223HB0071 · ₱77,200,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREET LIGHTS ALONG TAGBILARAN EAST RD (TAGBILARAN-JAGNA) - K0171 + 174 - K0174 + 695; K0177 + 088 - K0180 + 07024HB0015 · ₱72,983,810.49 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES, INFORMATIVE SIGNS AND SOLAR LIGHTLING ALONG JCT DAT-AN-CARMEN-SIERRA BULLONES-PILAR-ALICIA RD K00724HB0021 · ₱72,367,776.33 · mapped
- CONSTRUCTION OF JCT. TCSR POBLACION-CANCATAC (CORELLA) TO CANTIGUIB (ALBURQUERQUE)-ABUCAY NORTE (SIKATUNA) PROVINCIAL ROAD, CORELLA, BOHOL25HA0083 · ₱72,300,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT CORELLA, BOHOL23HA0117 · ₱69,250,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CONCRETING OF BRGY. LAYA GOING TO CAMBANAC LEADING TO SAN JUAN BUENAVENTURA, BACLAYON, BOHOL, STA.0+000-STA.2+670, BOHOL PROVINCE20H00054 · ₱67,550,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CONCRETING OF MONTAÑA-SAN JUAN-BUENAVINTURA ROAD LEADING TO EDITH GRAND GARDEN RESORT AND ADVENTURE PARK, BACLAYON, BOHOL20H00052 · ₱67,550,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CONCRETING OF MONTAÑA TO CAMBANAC BRGY. ROAD PASSING THRU MARQUIS SUNRISE SUNSET RESORT AND SPA AND BALAY KAHIMSOG TRAINING CENTER,20H00053 · ₱67,550,000.00 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0032 + 000 - K0033 + 000, K0051 + 406 - K0051 + 46625HA0043 · ₱67,500,000.00 · mapped
- Construction of Viga Flood Control Structure, Antequera, Bohol24HA0084 · ₱67,500,000.00 · mapped
- CONSTRUCTION OF 4STY 24CL, TAGBILARAN CITY CENTRAL ELEMENTARY SCHOOL, TAGBILARAN CITY, BOHOL20HA0135 · ₱56,512,077.77 · mapped
- NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS SECONDARY ROADS, TAGBILARAN EAST RD (TAGBILARAN CITY) SEC.1:K187+819-K188+484 , SEC. 2: K196+595-K197+261, SEC.3: K239+219-K240+21916H00059 · ₱56,324,586.42 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS-TO DECLARED TOURISM DESTINATIONS JCT. (TER) GUINDULMAN ANDA-BADIANG COGTONG ROAD LEADING TO BEACHES AND RESORTS, ANDA, BOHOL, STA.0+000-STA.1+078.4016H00039 · ₱56,025,900.00
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONASTRUCTION OF FLOOD MITIGATION STRUCTURES AT BARANGAY TAN-AWAN, TUBIGON, BOHOL24HA0037 · ₱53,025,000.00 · mapped
- Construction of Villanueva Tubigon Flood Control, Tubigon, Bohol24HA0002 · ₱52,974,619.82 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS./FCILITIES - CONSTRUCTION OF ROADS, BRGY. CASBU-BRGY. BATO, GUINDULMAN, BOHOL, STA.24HB0127 · ₱49,499,998.41 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (PUBLIC MARKET) IN BARANGAY WEST POBLACION, ALBURQUERQUE, BOHOL22HA0134 · ₱48,999,995.78 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF JIMILI-AN BARANGAY ROAD22HB0097 · ₱48,999,929.55 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) - JCT. (TER) BRGY. PROGRESO TO BRGY. CAMBAOL LEADING TO ALICIA PANORAMIC PARK, ALICIA, BOHOL22HB0084 · ₱48,994,108.16 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ABATAN RIVER, BRGY. STO. ROSARIO, ANTEQUERA, BOHOL20HA0100 · ₱48,950,000.00 · mapped
- CONSTRUCTION OF UPPER GUMAY BRIDGE AT UPPER GUMAY, PIÑAN, ZAMBOANGA DEL NORTE24JB0048 · ₱48,902,836.25 · mapped
- CONSTRUCTION OF SOLAR STREET LIGHTS AND ROAD SAFETY DEVICES WITHIN THE TUBIGON, TUBIGON, BOHOL23HA0163 · ₱48,200,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)- BRGY. CATUNGAWAN SUR LEADING TO LANDTHAI HILLS, GUINDULMAN, BOHOL STA.2+900 - STA.3+124HB0084 · ₱48,189,898.37 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BACLAYON SEAWALL, POBLACION, BACLAYON20HA0118 · ₱47,252,000.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ABATAN RIVER, BRGY. CABAWAN AND AGAHAY, MARIBOJOC, BOHOL, PHASE II20HA0125 · ₱47,250,998.60 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO AIRPORTS - JCT. PICR VIA BIKING-LIBAONG-BOLOD ACCESS ROAD LEADING TO NEW BOHOL INTERNATIONAL AIRPORT, PANGLAO, BOHOL19HA0058 · ₱47,250,000.00 · mapped
- REHABILITATION/RECONSTRUCTION UPGRADING OF DAMAGED PAVED ROAD AT TAGBILARAN NORTH ROAD, K0030+500-K015HA0168 · ₱46,540,000.00 · mapped
- NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, LOAY INTERIOR ROAD, SECTION 1: K0199+660 - K0200+773; SECTION 2: K0197+509 - K0199+000; SECTION3: K0173+474 - K0174+275; SECTION4:K0157+109 - K0157+879; SECTION5: K0191+011 - K0191+52717HB0016 · ₱45,982,850.00 · mapped
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROAD AT TAGBILARAN NORTH ROAD, K001+680-K002+193, K006+0815HA0189 · ₱44,085,841.11 · mapped
- INSTALLATION/ APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG JCT (TNR) MARIBOJOC-ANTEQUERA-CATAGBACAN (LOON) - K0011 + (-357) - K0016 + 60525HA0017 · ₱41,890,000.00 · mapped
- Construction of Flood Control Structure, Loboc River, Villaflor, Loboc , Bohol22HB0092 · ₱40,179,948.69 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF ROAD, SIKATUNA TO SEVILLA, BOHOL22H00028 · ₱38,600,000.00 · mapped
- INSTALLATION/ APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGTHING) ALONG THE PRESIDENT CARLOS P. GACIA CIRCUMFERENTIAL RD - K0010+434 - K0010+676, K0011+000 - K0013+500, K0014+000 - K0014+400, K0014+740 - K0016+680, K0017+000 - K0018+000, K0018+450 -25HA0039 · ₱38,225,000.00 · mapped
- CONSTRUCTION OF 1-UNIT 4-STOREY 8 LABORATORY BUILDING, PAGNITOAN NATIONAL HIGH SCHOOL, MARIBOJOC, BOHOL18HA0136 · ₱38,067,000.00 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
