Construction of Flood Control Canhaway and Sitio Ponod, Barangay Sawang, Guindulman, Bohol Phase 2
Construction of Flood Control Canhaway and Sitio Ponod, Barangay Sawang, Guindulman, Bohol Phase 2 is a DPWH-tracked public work in GUINDULMAN (BOHOL), BOHOL, Region VII. Reported contract value: ₱77,200,000.00. Status: Reported complete (DPWH). Contractor on record: N N YU CONST INC FORMERLY: YU CONST. Figures trace to sumbong.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost