Flood Control and Drainage21DD0159

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱27,567,377.00. Status: Reported complete (DPWH). Contractor on record: FIVE TRAVELLERS CONST INC. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Slope Protection with Flood Mitigation Structure along Mabalanoy Bridge, San Juan, Batangas
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVA-21-0008181

₱874,473,000.00 · FY2021

Released to Batangas 4th District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

10 projects · ₱312.6M total · 0 flags

Other projects by this contractor

No sat.

Construction of Flood Control Structure along Malangaan River (Upstream), Barangay Camachile, Doña Remedios Trinidad, Bulacan

DOÑA REMEDIOS TRINIDAD (BULACAN), BULACAN, Region III

2024₱48.2M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRAS PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRAS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALANGAAN RIVER (DOWNSTREAM), BARANGAY CAMACHILE, DONA REMEDIOS TRINIDAD, BULACAN

Region III, Region III

2024₱47.5M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CALICANTO, SAN JUAN, B

Batangas 4th DEO, Region IV-A

2025₱44.1M
Past target date (DPWH On-Going)
No sat.

Construction of Revetment along Lawaye River (Palahanan Section), San Juan, Batangas

SAN JUAN (BATANGAS), BATANGAS, Region IV-A

2023₱39.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG LAWAYE RIVER (SICO 2.0 SECTION), SAN JU

Batangas 4th DEO, Region IV-A

2024₱38.6M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PAMPANGA RIVER, BARANGAY ALUA, PHASE 1, SAN ISIDRO, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2025₱34.1M
Reported complete (DPWH)
View all 10 projects →

4. Implementation

Contract Amount

₱27,567,377.00

Progress

Reported complete (DPWH)

Start Date

April 12, 2021

Target End

November 17, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.