Buildings and Facilities23FJ0045

BIP- EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES- CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BRGY. POBLACION, PIO V. CORPUZ, MASBATE

BIP- EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES- CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BRGY. POBLACION, PIO V. CORPUZ, MASBATE is a DPWH-tracked public work in Masbate 3rd DEO, Region V. Reported contract value: ₱14,402,843.00. Status: Reported complete (DPWH). Contractor on record: SIR HENRIK'S CONST. Figures trace to dpwh.

Masbate 3rd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-C-23-002700 · ₱51,334,000 · release to the district office, not itemized per project

    Possible match · score 0.58

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23FJ0045 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-03-29 → 2021-03-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BIP- EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES- CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BRGY. POBLACION, PIO V. CORPUZ, MASBATE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Mawig Creek Flood Control, Sta. 0+000.00 - Sta. 0+050.00, Upstream Right Side, Sta. 0+000 - Sta. 0+030, Upstream Left Side, Sta. 0+000 - Sta. 0+085, Both Sides Downstream, Barangay Poblacion, Dimasalang, Masbate
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-C-23-002700

₱51,334,000.00 · FY2023

Released to 0000000 Philippine Racing - Commission (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

9 projects · ₱71.6M total · 0 flags

4. Implementation

Contract Amount

₱14,402,843.00

Progress

Reported complete (DPWH)

Start Date

September 14, 2023

Target End

January 25, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.