Roads21CG0056

ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - TERTIARY ROADS - CANDABA - SAN MIGUEL RD - K0071+184 - K0072+000, K0074+200 - K0074+462, K0079+100 - K0079+154, K0079+300 - K0079+332, K0079+349 - K0079+381, K0079+900 - K0080+000, K0081+228 - K0081+337

ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - TERTIARY ROADS - CANDABA - SAN MIGUEL RD - K0071+184 - K0072+000, K0074+200 - K0074+462, K0079+100 - K0079+154, K0079+300 - K0079+332, K0079+349 - K0079+381, K0079+900 - K0080+000, K0081+228 - K0081+337 is a DPWH-tracked public work in Pampanga 1st DEO, Region III. Reported contract value: ₱9,600,681.28. Status: Reported complete (DPWH). Contractor on record: CHOLO CONST AND TRADING. Figures trace to dpwh.

Pampanga 1st DEO, Region III
Region: Region III

Money Trail

1. Appropriation

Possible match · score 79%

UACS
18001
Amount
₱15,400,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along Porac River, Jalung, Pampanga
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVA-21-0008181

₱392,621,000.00 · FY2021

Released to Batangas 1st District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

139 projects · ₱1.7B total · 0 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION AT SAN ROQUE BITAS CREEK, ARAYAT, PAMPANGA

Pampanga 1st DEO, Region III

2025₱91.7M
Past target date (DPWH On-Going)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT PALINLANG CREEK, ARAYAT, PAMPANGA

Pampanga 1st DEO, Region III

2025₱91.6M
Reported complete (100% progress, DPWH status On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONCRETING OF SLOPE PROTECTION AT INUMAN BAKA STA. ANA-ARAYAT PORTION, PAMPANGA PHASE II

Pampanga 1st DEO, Region III

2025₱91.5M
Past target date (DPWH On-Going)

Rehabilitation of River Channel and Construction of Concrete Slope Protection, Malisik R.C., Candaba, Pampanga

CANDABA (PAMPANGA), PAMPANGA, Region III

2022₱82.1M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BALIWAG - CANDABA - STA. ANA RD. - K0067+433 - K0067+571, CANDABA, PAMPANGA

Pampanga 1st DEO, Region III

2019₱67.9M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONCRETING OF SLOPE PROTECTION AT INUMAN BAKA STA. ANA-ARAYAT PORTION, PAMPANGA PHASE I

Pampanga 1st DEO, Region III

2025₱64.2M
Past target date (DPWH On-Going)
View all 139 projects →

4. Implementation

Contract Amount

₱9,600,681.28

Progress

Reported complete (DPWH)

Start Date

October 14, 2021

Target End

January 11, 2022

5. Audit