Flood Control and Drainage18FB0014

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BRGY. 4 QUIRANGAY FLOOD CONTROL SYSTEM (MAYON SABO WORKS), CAMALIG, ALBAY

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BRGY. 4 QUIRANGAY FLOOD CONTROL SYSTEM (MAYON SABO WORKS), CAMALIG, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱42,209,017.35. Status: Reported complete (DPWH). Contractor on record: NUMERICAL GATE CONST. Figures trace to dpwh.

Albay 2nd DEO, Region V
Region: Region V

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱45,000

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-18-0014897 · ₱761,214 · release to the district office, not itemized per project

    Possible match · score 0.77

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱42,209,017 · NUMERICAL GATE CONSTRUCTION AND SUPPLY .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-02-01 → 2023-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Low flood hazard · Albay

Based on the coordinates published with the DPWH record and NOAH file Albay.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BRGY. 4 QUIRANGAY FLOOD CONTROL SYSTEM (MAYON SABO WORKS), CAMALIG, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱45,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Brgy. 4, Quirangay Flood Control System (Mayon SABO Works), Camalig, Albay
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-18-0014897

₱761,214.00 · FY2018

Released to Division of Davao Oriental (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Const.of Brgy.4 Quirangay Flood Control System

₱42,209,017.35 · NUMERICAL GATE CONSTRUCTION AND SUPPLY .

Contractor

B

70 projects · ₱2.4B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-DARAGA URBAN TOURISM ECO ROUTE ROAD, ALBAY, DARAGA AND LEGAZPI CITY, ALBAY (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2024₱168.9M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-DARAGA URBAN TOURISM ECO ROUTE ROAD, ALBAY, BRGY. BUSAY, BRGY. BINITAYAN, BRGY. PAWA, ALBAY (2ND LEGISLATIVE DI

Region V, Region V

2023₱124.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS - GUINOBATAN-JOVELLAR-DONSOL ROAD (ILULUAN - PARIAAN SECTION) LEADING TO PILAR PORT, CAMALIG, ALBAY

Albay 2nd DEO, Region V

2019₱96.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- CAMALIG BYPASS ROAD INCLUDING DRAINAGE SYSTEMS, ALBAY

Albay 2nd DEO, Region V

2023₱96.5M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, DARAGA URBAN TOURISM ECO ROUTE (DUTERTE) PROJECT, ALBAY, DARAGA, ALBAY (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2020₱86.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/REHABILITATION OF COTMON-HOYOP-HOYOPAN FLOOD CONTROL SYSTEM, BRGY. COTMON, CAMALIG, ALBAY

Albay 2nd DEO, Region V

2020₱74.8M
Reported complete (DPWH)
View all 70 projects →

4. Implementation

Contract Amount

₱42,209,017.35

Progress

Reported complete (DPWH)

Start Date

February 12, 2018

Target End

July 26, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.