Construction of Flood Mitigation Structure Construction of Flood Mitigation Structure along Bulod Bridge (B00960MN), Upstream (R/S), Tubod, Lanao del Norte
Construction of Flood Mitigation Structure Construction of Flood Mitigation Structure along Bulod Bridge (B00960MN), Upstream (R/S), Tubod, Lanao del Norte is a DPWH-tracked public work in TUBOD (CAPITAL) (LANAO DEL NORTE), LANAO DEL NORTE, Region X. Reported contract value: ₱49,000,000.00. Status: Reported complete (DPWH). Contractor on record: RUDHIL CONST & ENT INC FORMERLY R. Figures trace to sumbong.
Total Contract Cost


