RUDHIL CONST & ENT INC FORMERLY R is listed as a company organization in Philippine public procurement records on this site, with 36 linked DPWH project(s) totaling about ₱2,065,194,923.28. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
RUDHIL CONST & ENT INC FORMERLY R
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 36
- Total value
- ₱2,065,194,923.28
- Published flags
- 0
- Region
- LANAO DEL NORTE · Region VII
Public Record Grade
A transparent, data-derived summary of reported public records for RUDHIL CONST & ENT INC FORMERLY R — not an accusation or finding of wrongdoing.
Score: 78.20 / 100 · Projects in sample: 36 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 63.1/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 63.1
- lateCompletedProjects
- 7
- onTimeCompletedProjects
- 23
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 36
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 36
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 36
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
33 geotagged projects — Open full map · Download projects (CSV)
- Construction of Flood Control Structure along Jagobiao Creek, Barangay Casili to Barangay Sacsac, Phase II, Consolacion, Cebu24HN0072 · ₱144,699,797.60 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - DIPOLOG - PUNTA - DANSULLAN - S. OSMEÑA - ZAMBOANGA DEL NORTE/SUR BDRY. ROAD24J00053 · ₱143,487,777.28 · mapped
- OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION RIVERBANK FACILITIES ALONG JAGOBIAO CREEK, PACKAGE I, BARANGAY SACSAC, CONSOLACION, CEBU25HN0104 · ₱135,046,395.31 · mapped
- Construction of Flood Control at Sibuguey River along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, Barangay Paradise, Diplahan, Zamboanga Sibugay Package 122J00049 · ₱104,499,773.70 · mapped
- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TUMAGA RIVER (GUIWAN SECTION), ZAMBOANGA CITY PACKAGE 124J00148 · ₱96,450,193.80 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - PAGADIAN CITY-ZAMBOANGA CITY RD - K1920 + 000 - K1922 + 763, K1936 + 473 - K1936 + 786.7824J00116 · ₱90,698,836.29 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY RD - K1881+000-K1882+000, K1885+000-K1886+000, K1889+275-K1890+062.0424J00117 · ₱82,133,552.07 · mapped
- Construction of Flood Control Structures along Dalama (Upstream-Left Side), Tubod, Lanao del Norte22KF0021 · ₱80,641,190.00 · mapped
- Construction of Flood Control Structures along Dalama (Upstream-Right Side), Tubod, Lanao del Norte22KF0019 · ₱80,641,190.00 · mapped
- Construction of Flood Control Structure along Layawan River, Dapdap Bridge Upstream, Polanco, Zamboanga del Norte24JB0033 · ₱77,584,062.83 · mapped
- Construction of Flood Control Structure along Sibuguey River (Phase XII) Siay, Zamboanga Sibugay22JF0010 · ₱76,103,499.33 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE JCT. PULAUAN PORT ROAD K1827+588-K1827+782.6022JD0053 · ₱75,572,375.98 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES ROAD LEADING TO INDUSTRIAL AREA, STA. MARIA, MINSUBONG AND ISIDRO D. TAN, IN SUPPORT OF IT-BPM TANGUB CITY, MISAMIS OCCIDENTAL18KJ0111 · ₱59,583,124.82 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, CLARIN TOWN CENTER, CLARIN, MISAMIS OCCIDENTAL17KJ0009 · ₱55,827,277.40
- Construction of Flood Mitigation Structure along Maigo Bridge (B00949MN), Upstream (L/S), Maigo, Lanao del Norte23KG0024 · ₱53,075,000.00 · mapped
- Construction of Flood Mitigation Structure along Maigo Bridge (B00949MN), Downstream (R/S), Maigo, Lanao del Norte23KG0023 · ₱53,075,000.00 · mapped
- Construction of Flood Mitigation Structure Construction of Flood Mitigation Structure along Bulod Bridge (B00960MN), Upstream (R/S), Tubod, Lanao del Norte24KG0018 · ₱49,000,000.00 · mapped
- Construction of Flood Mitigation Structure Construction of Flood Mitigation Structure along Titunod Bridge II (B00956MN), Upstream (R/S), Kolambugan, Lanao del Norte24KG0024 · ₱49,000,000.00 · mapped
- Construction of Slope Protection along Segapod Bridge, (Downstream) (L/S), Sta. 0+000.00 - Sta. 0+280.00, Maigo, Lanao del Norte22KF0025 · ₱49,000,000.00 · mapped
- Construction of Seawall, Cuya, Ubay, Bohol23HC0039 · ₱48,999,999.44 · mapped
- Construction of Flood Control Structure and Drainage System along Iligan River (Pala-o Section), Iligan City23KM0030 · ₱48,250,000.00 · mapped
- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES, INABANGA, BOHOL24HC0167 · ₱48,240,000.00 · mapped
- Construction of Flood Mitigation Structure Construction of Flood Mitigation Structure along Titunod Bridge II (B00956MN), Downstream (R/S), Kolambugan, Lanao del Norte24KG0017 · ₱48,009,820.77 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF CAMAYAN RIVER FLOOD CONTROL, LORETO, CORTES, BOHOL19HA0157 · ₱47,448,994.35 · mapped
- CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD, BARANGAY TAYUD, CONSOLACION, CEBU24HN0229 · ₱47,223,992.48 · mapped
- Construction of Flood Mitigation Structures and Drainage System, Lapacan Sur, Dait Drainage Buenavista, Bohol23HC0077 · ₱39,100,000.00 · mapped
- CONSTRUCTION OF 4 STOREY 20 CLASSROOM SCHOOL BUILDING AT TALON-TALON NATIONAL HIGH SCHOOL, ZAMBOANGA CITY16JA0108 · ₱30,352,430.36 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CALUNASAN FLOOD CONTROL, CALUNASAN, CALAPE, BOHOL19HA0011 · ₱30,240,460.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MANDUAG FLOOD CONTROL, MANDAUG, CALAPE, BOHOL19HA0012 · ₱30,233,900.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS LABUYO-TANGUB-SILANGA ACCESS ROADS LEADING TO SILANGA PORT, TANGUB CITY, MISAMIS OCCIDENTAL18KJ0007 · ₱27,925,842.15 · mapped
- MFO1 ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLI0017HA0031 · ₱27,062,680.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM-CONSTRUCTION OF SAL-ING RIVER CONTROL, BALILIHAN, BOHOL18HA0081 · ₱18,607,620.00 · mapped
- Construction of Flood Control Brgy. Calolot, Tambulig, Zamboanga del Sur23JE0073 · ₱9,779,316.20 · mapped
- Construction of Drainage Canal, Barangay Sudlon, Molave, Zamboanga del Sur23JE0031 · ₱4,939,955.66 · mapped
- CONSTRUCTION OF 1 STY.-1CL SCHOOL BLDG. WITH CR AT SAN ROQUE NHS, POBLACION, ALBURQUERQUE, BOHOL15HA0157 · ₱1,682,172.22
- COMPLETION OF MULTI-PURPOSE BUILDING, BARANGAY SONGCULAN, DAUIS, BOHOL16HA0016 · ₱978,693.24
Equipment & capacity
PCAB license
- License no.
- 22901
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Apr 4, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 22901); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
25 evaluations listed across 6 GPPB CPES releases; average final rating 92.8% over 15 rated projects; 25 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 6, 2025 | DPWH (JV) | ₱43,802,140.00 | Completed | 97.3% | 95.7% | 40th, p. 257 |
| Jun 2, 2025 | DPWH | ₱48,199,650.00 | On-going | 95.6% | — | 40th, p. 82 |
| Mar 17, 2025 | DPWH | ₱48,999,995.00 | Completed | 98.1% | 95.8% | 40th, p. 276 |
| Apr 17, 2024 | DPWH (JV) | ₱89,745,000.00 | Completed | 90.4% | 93.8% | 38th, p. 217 |
| Nov 29, 2023 | DPWH | ₱53,075,000.00 | On-going | 96.9% | — | 37th, p. 95 |
| Nov 25, 2023 | DPWH | ₱44,049,865.00 | Completed | 98.6% | 96.2% | 37th, p. 95 |
| Nov 11, 2023 | DPWH (JV) | ₱100,108,757.00 | Completed | 95.7% | 95.7% | 37th, p. 71 |
| Sep 7, 2023 | DPWH | ₱44,049,865.00 | On-going | 94.2% | — | 36th, p. 186 |
| Sep 6, 2023 | DPWH | ₱37,240,000.00 | Final | 97.8% | 95.1% | 36th, p. 186 |
| Sep 4, 2023 | DPWH | ₱34,394,000.00 | Final | 96.4% | 93.5% | 36th, p. 185 |
| Aug 22, 2023 | DPWH | ₱46,802,189.00 | Final | 98.7% | 94.7% | 36th, p. 186 |
| Aug 22, 2023 | DPWH | ₱53,075,000.00 | On-going | 97.8% | — | 36th, p. 186 |
Showing the 12 most recent of 25.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →