Construction of Flood Mitigation Structure22KF0019

Construction of Flood Control Structures along Dalama (Upstream-Right Side), Tubod, Lanao del Norte

Construction of Flood Control Structures along Dalama (Upstream-Right Side), Tubod, Lanao del Norte is a DPWH-tracked public work in TUBOD (CAPITAL) (LANAO DEL NORTE), LANAO DEL NORTE, Region X. Reported contract value: ₱80,641,190.00. Status: Reported complete (DPWH). Contractor on record: RUDHIL CONST & ENT INC FORMERLY R. Figures trace to sumbong.

TUBOD (CAPITAL) (LANAO DEL NORTE), LANAO DEL NORTE, Region X
Region: Region X

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱40,000

    Probable match · score 0.92

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-22-0003174 · ₱203,890,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22KF0019 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-08-13 → 2019-08-13

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Lanao del Norte

Based on the coordinates published with the DPWH record and NOAH file LanaoDelNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Control Structures along Dalama (Upstream-Right Side), Tubod, Lanao del Norte

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 92%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Iligan River, Barangay Tubod, Iligan City, Lanao del Norte
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003174

₱203,890,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003026

₱35,400,000.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

36 projects · ₱2.1B total · 0 flags

4. Implementation

Contract Amount

₱80,641,190.00

Progress

Reported complete (DPWH)

Start Date

March 18, 2022

Target End

January 6, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.