Flood Control and Drainage17DI0075No coordinates published by DPWH

CONSTRUCTION OF RIVER CONTROL AT CANLALAY WATERWAYS, BRGY. CANLALAY, BIÑAN CITY, LAGUNA

CONSTRUCTION OF RIVER CONTROL AT CANLALAY WATERWAYS, BRGY. CANLALAY, BIÑAN CITY, LAGUNA is a DPWH-tracked public work in Laguna 2nd DEO, Region IV-A. Reported contract value: ₱1,710,835.00. Status: Reported complete (DPWH). Contractor on record: ALPHA. Figures trace to dpwh.

Laguna 2nd DEO, Region IV-A

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱19,920 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0005884 · ₱511,168 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17DI0075 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF RIVER CONTROL AT CANLALAY WATERWAYS, BRGY. CANLALAY, BIÑAN CITY, LAGUNA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱19,920,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Rehabilitation of Flood Control Structures along Malikbe River at Malikbe Bridge, Brgy. Maravilla, Nagcarlan, Laguna
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0005884

₱511,168.00 · FY2017

Released to Southern Samar Sa National Comprehensive High School (Balangiga NHS) (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

831 projects · ₱32.1B total · 0 flags

4. Implementation

Contract Amount

₱1,710,835.00

Progress

Reported complete (DPWH)

Start Date

June 30, 2017

Target End

August 28, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.